A Disassembly Sequence Planning Method With Team-Based Genetic Algorithm for Equipment Maintenance in Hydropower Station

被引:14
作者
Li, Bailin [1 ]
Li, Chaoshun [1 ]
Cui, Xiaolong [1 ]
Lai, Xinjie [1 ]
Ren, Jie [2 ]
He, Qiang [2 ]
机构
[1] Huazhong Univ Sci & Technol, Coll Hydropower & Informat Engn, Wuhan 430074, Peoples R China
[2] China Yangtze Power Co Ltd, Yichang 443002, Peoples R China
来源
IEEE ACCESS | 2020年 / 8卷
基金
中国国家自然科学基金;
关键词
Maintenance engineering; Hydroelectric power generation; Genetic algorithms; Linear programming; Optimization; Planning; Matrix converters; Equipment maintenance; disassembly sequence planning; team-based genetic algorithm; fast feasible solution generator; forward-and-backward optimization operator; multi-point heuristic mutation; OPTIMIZATION; REPRESENTATION; GENERATION; SYSTEM;
D O I
10.1109/ACCESS.2020.2979247
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Disassembly sequence planning (DSP) is an important part of equipment maintenance in a hydropower station. In this paper, the generation of an excellent disassembly sequence (DS) for equipment is studied. Firstly, according to the characteristics of hydropower equipment, a combination node type is added to the directed graph analysis model, and the distance factor of components in space is added to the evaluation function of DS. Secondly, a DSP strategy including the grouping and minimization of the node's scope is adopted to reduce computational complexity. Thirdly, a novel team-based genetic algorithm (TBGA) combining teams, fast feasible solution generator (FFSG), precedence preservative crossover (PPX) mechanism, multi-point heuristic mutation (MHM) mechanism, and forward-and-backward optimization operator (FBOO) is designed for DSP. The proposed TBGA maintains global search capabilities through teams and enhances local search capabilities through individuals. In the evolutionary process, teams, MHM, and FBOO have good complementarity to improve the comprehensive performance of the algorithm. Finally, four experiments are conducted and the performance of TBGA is tested based on the comparison of a well-known genetic algorithm, simplified teaching-learning-based optimization, and simplified swarm optimization algorithm. The results show that the proposed method can get better search results in limited iterations and require only about 25% time of other algorithms.
引用
收藏
页码:47538 / 47555
页数:18
相关论文
共 46 条
  • [21] Multi-objective optimization of the closure law of guide vanes for pumped storage units
    Lai, Xinjie
    Li, Chaoshun
    Zhou, Jianzhong
    Zhang, Nan
    [J]. RENEWABLE ENERGY, 2019, 139 : 302 - 312
  • [22] Disassembly sequencing: a survey
    Lambert, AJD
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (16) : 3721 - 3759
  • [23] Optimal disassembly of complex products
    Lambert, AJD
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (09) : 2509 - 2523
  • [24] Optimum disassembly sequence generation
    Lambert, FJD
    [J]. ENVIRONMENTALLY CONSCIOUS MANUFACTURING, 2001, 4193 : 56 - 67
  • [25] A low-complexity method for authoring an interactive virtual maintenance training system of hydroelectric generating equipment
    Li, Bailin
    Bi, Yaxiong
    He, Qiang
    Ren, Jie
    Li, Zhaohui
    [J]. COMPUTERS IN INDUSTRY, 2018, 100 : 159 - 172
  • [26] Multi-objective complementary scheduling of hydro-thermal-RE power system via a multi-objective hybrid grey wolf optimizer
    Li, Chaoshun
    Wang, Wenxiao
    Chen, Deshu
    [J]. ENERGY, 2019, 171 : 241 - 255
  • [27] An object-oriented intelligent disassembly sequence planner for maintenance
    Li, JR
    Khoo, LP
    Tor, SB
    [J]. COMPUTERS IN INDUSTRY, 2005, 56 (07) : 699 - 718
  • [28] A novel representation scheme for disassembly sequence planning
    Li, JR
    Khoo, LP
    Tor, SB
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 20 (08) : 621 - 630
  • [29] Developing virtual environments for industrial training
    Lin, FH
    Ye, L
    Duffy, VG
    Su, CJ
    [J]. INFORMATION SCIENCES, 2002, 140 (1-2) : 153 - 170
  • [30] Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system
    Liu, Xinhua
    Peng, Gaoliang
    Liu, Xiumei
    Hou, Youfu
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (5-8) : 829 - 839