Application of a Joint Deterministic-Probabilistic Criterion to Wind Integrated Bulk Power System Planning

被引:30
作者
Billinton, Roy [1 ]
Gao, Yi [1 ]
Karki, Rajesh [1 ]
机构
[1] Univ Saskatchewan, Dept Elect & Comp Engn, Saskatoon, SK S7N 5A9, Canada
关键词
Bulk power system; joint deterministic and probabilistic criterion; planning; wind capacity credit; wind energy; ADEQUACY ASSESSMENT; GENERATING SYSTEMS; SPEED CORRELATION; ENERGY; MODELS;
D O I
10.1109/TPWRS.2009.2039652
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The basic objective of bulk power system planning is to develop the system as economically as possible while maintaining an acceptable level of service reliability. The traditional methods used by system planners to maintain acceptable bulk power system reliability are challenged in the present move to incorporate higher wind power penetration levels. Combining deterministic considerations with probabilistic assessment in order to evaluate the quantitative system risk and conduct bulk power system planning has therefore become increasingly necessary and important in recent years. This paper examines the capacity value of wind generation using various approaches and the utilization of this value under the deterministic N - 1 criterion. The application of a joint deterministic-probabilistic criterion for bulk system expansion planning in wind integrated systems is presented. The application of the conventional deterministic N - 1, the basic probabilistic and the joint deterministic-probabilistic criteria is illustrated in a wind integrated test system in this paper.
引用
收藏
页码:1384 / 1392
页数:9
相关论文
共 14 条
[1]  
[Anonymous], 2005, EFF INT WIND POW TRA
[2]   Time-series models for reliability evaluation of power systems including wind energy [J].
Billinton, R ;
Chen, H ;
Ghajar, R .
MICROELECTRONICS AND RELIABILITY, 1996, 36 (09) :1253-1261
[3]   Assessment of risk-based capacity benefit factors associated with wind energy conversion systems [J].
Billinton, R ;
Chen, H .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :1191-1196
[4]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[5]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[6]  
BILLINTON R, 2008, P PROB METH APPL POW
[7]   Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy [J].
Billinton, Roy ;
Gao, Yi .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2008, 23 (01) :163-170
[8]  
*CAN EL ASS, 2007, REP BULK EL SYST DEL
[9]   Adequacy assessment of generating systems containing wind power considering wind speed correlation [J].
Gao, Y. ;
Billinton, R. .
IET RENEWABLE POWER GENERATION, 2009, 3 (02) :217-226
[10]  
Li W., 1998, INSTALLATION GUIDE U