共 168 条
[1]
ABB, 2011, ONB DC GRID STEP FOR
[2]
Aggeler D., 2010, 2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe), P1, DOI DOI 10.1109/ISGTEUROPE.2010.5638899
[3]
One year operation of a 9 kW HVDC UPS350Vat Gnesta Municipality data center
[J].
INTELEC 07 - 29TH INTERNATIONAL TELECOMMUNICATIONS ENERGY CONFERENCE, VOLS 1 AND 2,
2007,
:40-+
[5]
Allee G, 2012, IEEE POWER ENERGY M, V10, P50, DOI 10.1109/MPE.2012.2212607
[6]
Allen W., 2002, Intelec. 24th Annual International Telecommunications Energy Conference (Cat. No.02CH37374), P287, DOI 10.1109/INTLEC.2002.1048670
[7]
Anand S., 2010, IECON 2010 - 36th Annual Conference of IEEE Industrial Electronics, P3034, DOI 10.1109/IECON.2010.5674947
[8]
[Anonymous], 2011, 30013230 ETSI EN
[9]
[Anonymous], 2003, COMPUT ENG
[10]
[Anonymous], 2016, L1203 ITU