Comprehensive methodology for geological risk and multy-risk assessment

被引:1
作者
Frantzova, Antoaneta [1 ]
机构
[1] Bulgarian Acad Sci, Geol Inst, Acad Georgi Bonchev Str,Block 24, Sofia 1113, Bulgaria
来源
SPISANIE NA B LGARSKOTO GEOLOGICHESKO DRUZHESTOV-REVIEW OF THE BULGARIAN GEOLOGICAL SOCIETY | 2021年 / 82卷
关键词
risk assessment; multy-risk; geological hazards;
D O I
10.52215/rev.bgs.2021.82.3.171
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
This paper presents methodology for geological risk and multy-risk assessment. It is fully in accordance with IEC 31010:2019 and JRC recommendations and has been already applied in the practice. The methodology demonstrating flexibility, adaptability and sustainability within a set of all geological hazards. It is successfully applied to the complex risk assessment of Primorsko municipality.
引用
收藏
页码:171 / 173
页数:3
相关论文
共 50 条
[21]   Risk assessment and its influencing factors analysis of geological hazards in typical mountain environment [J].
Lin, Jinhuang ;
Chen, Wenhui ;
Qi, Xinhua ;
Hou, Haoran .
JOURNAL OF CLEANER PRODUCTION, 2021, 309
[22]   Risk assessment of secondary geological disasters induced by the Yushu earthquake [J].
Quanfu Niu ;
Weiming Cheng ;
Yong Liu ;
Yaowen Xie ;
Hengxing Lan ;
Yanrong Cao .
Journal of Mountain Science, 2012, 9 :232-242
[23]   Risk Assessment of Secondary Geological Disasters Induced by the Yushu Earthquake [J].
NIU QuanfuCHENG WeimingLIU YongXIE YaowenLAN HengxingCAO Yanrong College of Earth and Environmental ScienceLanzhou UniversityLanzhou China State Key Laboratory of Resources and Environmental Information SystemInstitute of Geographic Sciences and Natural Resources ResearchChinese Academy of SciencesBeijing China Gansu Provincial Electric Power Design InstituteLanzhou China .
Journal of Mountain Science, 2012, 9 (02) :232-242
[24]   Geological risk assessment for the rapid development area of the Erhai Basin [J].
Yang, Liu ;
Wang, Zhanqi ;
Jin, Gui ;
Chen, Dongdong ;
Wang, Zhan .
PHYSICS AND CHEMISTRY OF THE EARTH, 2015, 89-90 :79-90
[25]   Construction of Opening Regional Geological Hazards Risk Assessment System [J].
Zhu Jixiang ;
Zhang Lizhong ;
Zhou Xiaoyuan ;
Wang Qian .
2011 INTERNATIONAL CONFERENCE ON PHOTONICS, 3D-IMAGING, AND VISUALIZATION, 2011, 8205
[26]   Risk Assessment and Management of Geological Disaster Based on Risk period Analysis and GIS in Loess Areas [J].
Pan, Wangsheng ;
Lu, Yudong ;
Guo, Jinyan .
ENVIRONMENTAL TECHNOLOGY AND RESOURCE UTILIZATION II, 2014, 675-677 :1184-1191
[27]   Methodology for Risk Assessment of Substructures for Floating Wind Turbines [J].
Proskovics, Roberts ;
Hutton, Gail ;
Torr, Ralph ;
Scheu, Matti Niclas .
13TH DEEP SEA OFFSHORE WIND R&D CONFERENCE, EERA DEEPWIND'2016, 2016, 94 :45-52
[28]   Risk Assessment Methodology for Dams (RAM-DSM) [J].
Matalucci, RV .
PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, :169-176
[29]   EXTREME RISK ASSESSMENT METHODOLOGY (ERAM) IN AVIATION SYSTEMS [J].
Cioaca, Catalin ;
Constantinescu, Cristian-George ;
Boscoianu, Mircea ;
Lile, Ramona .
ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2015, 14 (06) :1399-1408
[30]   Methodology for preliminary assessment of Natech risk in urban areas [J].
Ana Maria Cruz ;
Norio Okada .
Natural Hazards, 2008, 46 :199-220