Improved energy management technique in pipe-embedded wall heating/cooling system in residential buildings

被引:56
作者
Krzaczek, M. [1 ]
Florczuk, J. [1 ]
Tejchman, J. [1 ]
机构
[1] Gdansk Univ Technol, Fac Civil & Environm Engn, Narutowicza 11-12, PL-80233 Gdansk, Poland
关键词
Residential building; Energy management technique; Thermal Barrier; Field measurements; Pipe-embedded structure; Fuzzy logic; MODEL-PREDICTIVE CONTROL; EXPERIMENTAL VALIDATION; FREQUENCY-DOMAIN; TIME-DOMAIN; EFFICIENCY; ENVELOPE; TEMPERATURE; PERFORMANCE; IMPACT; WATER;
D O I
10.1016/j.apenergy.2019.113711
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Effective and environmentally responsive techniques of energy management in residential buildings are desirable for the resulting reduction of energy costs and consumption. In this paper, an improved and efficient technique of energy management in pipe-embedded wall heating/cooling systems, called the Thermal Barrier, is described. Specifically, the Thermal Barrier is a technique focused on the management and control of heat supply into and heat extraction from external walls containing embedded pipes. The installed pipe-embedded wall heating/cooling system is fully controlled by a special fuzzy logic program that synchronizes the heat supply/extraction with variable heat loads. The main operation rule of the Thermal Barrier is to keep changes of the wall internal energy close to zero for the given reference temperature of a pseudo-surface created by an embedded pipe system of the wall heat exchanger. Comprehensive field measurement results associated with an example Thermal Barrier System installed in a residential two-story house are presented. These measurements confirmed the high-efficiency of the Thermal Barrier and its ability to use low-grade heat sources and sinks to effectively control an indoor climate. The supply water temperature was very low (25.3 degrees C) in the winter and very high (20.5 degrees C) in the summer. Daily variations of the indoor air temperature did not exceed 0.8 degrees C throughout the year. During the summer, the Thermal Barrier System operated in cooling-mode only from a low-grade renewable heat sink. The flexibility of the Thermal Barrier also allows for using heat sources/sinks different from those in the test house.
引用
收藏
页数:27
相关论文
共 46 条
[31]  
SEWACO Inc, 2014, SEWACO SYST TECHN DO
[32]   Energy saving potential of pipe-embedded building envelope utilizing low-temperature hot water in the heating season [J].
Shen, Chong ;
Li, Xianting .
ENERGY AND BUILDINGS, 2017, 138 :318-331
[33]   Dynamic thermal performance of pipe-embedded building envelope utilizing evaporative cooling water in the cooling season [J].
Shen, Chong ;
Li, Xianting .
APPLIED THERMAL ENGINEERING, 2016, 106 :1103-1113
[34]   Numerical analyses of novel prefabricated structural wall panels in residential buildings based on laboratory tests in scale 1:1 [J].
Skarzynski, Lukasz ;
Marzec, Ireneusz ;
Drag, Krzysztof ;
Tejchman, Jacek .
EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2020, 24 (09) :1450-1482
[35]   Building models for model predictive control of office buildings with concrete core activation [J].
Sourbron, Maarten ;
Verhelst, Clara ;
Helsen, Lieve .
JOURNAL OF BUILDING PERFORMANCE SIMULATION, 2013, 6 (03) :175-198
[36]   Optimal Intermittent Regulation of Tubes-embedded Building Envelope Cooling System [J].
Sui, Xuemin ;
Wang, Huajiang ;
Yan, Jian ;
Guo, Hong .
10TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATION AND AIR CONDITIONING, ISHVAC2017, 2017, 205 :2639-2646
[37]   Performance analysis of pulsed flow control method for radiant slab system [J].
Tang, Haida ;
Raftery, Paul ;
Liu, Xiaohua ;
Schiavon, Stefano ;
Woolley, Jonathan ;
Bauman, Fred S. .
BUILDING AND ENVIRONMENT, 2018, 127 :107-119
[38]  
U. S. Energy Information Administration (EIA), 2015, MONTHL EN REV
[39]   Model predictive control of a thermally activated building system to improve energy management of an experimental building: Part I-Modeling and measurements [J].
Viot, H. ;
Sempey, A. ;
Mora, L. ;
Batsale, J. C. ;
Malvestio, J. .
ENERGY AND BUILDINGS, 2018, 172 :94-103
[40]   Model predictive control of a thermally activated building system to improve energy management of an experimental building: Part II - Potential of predictive strategy [J].
Viot, H. ;
Sempey, A. ;
Mora, L. ;
Batsale, J. C. ;
Malvestio, J. .
ENERGY AND BUILDINGS, 2018, 172 :385-396