Investigating the Role of BIM in Stakeholder Management: Evidence from a Metro-Rail Project

被引:34
作者
Gaur, Sulakshya [1 ]
Tawalare, Abhay [1 ]
机构
[1] Visvesvaraya Natl Inst Technol, Dept Civil Engn, Nagpur 440010, Maharashtra, India
关键词
Stakeholder management (SM); Building information modeling (BIM); Megaproject; Construction project; Conceptual model; CRITICAL SUCCESS FACTORS; CONSTRUCTION; IMPLEMENTATION; BENEFITS; TRANSPARENCY; PERFORMANCE; STRATEGIES; ADOPTION; IMPROVE; RISKS;
D O I
10.1061/(ASCE)ME.1943-5479.0000979
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Building information modeling (BIM) is a technology that promotes increased levels of collaboration among teams involved in projects. This research work aims to map the advantages of BIM with the various stakeholder management (SM) practices being adopted. Through semistructured interviews with project personnel on a metro-rail project, 17 advantages of BIM were coded. These were grouped under five constructs: (1) asset tagging, (2) design optimization, (3) progress monitoring, (4) quick decision-making, and (5) cost monitoring and control. Additionally, 21 SM strategies were determined from the literature, which was analyzed using micro-interlocutor analysis (MIA). These were grouped under three groups and represented pillars of the SM process. These BIM advantages were then mapped with the three SM principles, i.e., stakeholder communication and collaboration, engagement, and satisfaction, which resulted in the generation of a conceptual BIM-SM model. The findings of this study revealed major implications and benefits of BIM adoption in a mega construction project in India and presented an important aspect of the role it can play in achieving better SM.
引用
收藏
页数:11
相关论文
共 67 条
  • [1] The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM
    Ahankoob, Alireza
    Manley, Karen
    Abbasnejad, Behzad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 588 - 599
  • [2] Adoption of BIM by architectural firms in India: technology-organization-environment perspective
    Ahuja, Ritu
    Jain, Megha
    Sawhney, Anil
    Arif, Mohammed
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2016, 12 (04) : 311 - 330
  • [3] Exploring the role of building information modeling in construction safety through science mapping
    Akram, Ramsha
    Thaheem, Muhammad Jamaluddin
    Nasir, Abdur Rehman
    Ali, Tauha Hussain
    Khan, Shamraiza
    [J]. SAFETY SCIENCE, 2019, 120 : 456 - 470
  • [4] BIM benefits and its influence on the BIM implementation in Malaysia
    Al-Ashmori, Yasser Yahya
    Othman, Idris
    Rahmawati, Yani
    Amran, Y. H. Mugahed
    Sabah, S. H. Abo
    Rafindadi, Aminu Darda'u
    Mikic, Miljan
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2020, 11 (04) : 1013 - 1019
  • [5] Amoatey C, 2017, BUILT ENVIRON PROJ A, V7, P143, DOI 10.1108/BEPAM-07-2016-0030
  • [6] [Anonymous], 2017, A Guide to the SCRUM BODY OF KNOWLEDGE (SBOK TM GUIDE) Third Edition A Comprehensive Guide to Deliver Projects using Scrum Includes two chapters about Scaling Scrum for Large Projects and the Enterprise
  • [7] BARRIBALL KL, 1994, J ADV NURS, V19, P328
  • [8] Managing the expectations of external stakeholders in construction projects
    Chan, Albert P. C.
    Oppong, Goodenough D.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 736 - 756
  • [9] Cova B., 2005, International Journal of Project Management, V23, P354, DOI 10.1016/j.ijproman.2005.01.006
  • [10] Supply-chain transparency within industrialized construction projects
    Cus-Babic, Nenad
    Rebolj, Danijel
    Nekrep-Perc, Matjaz
    Podbreznik, Peter
    [J]. COMPUTERS IN INDUSTRY, 2014, 65 (02) : 345 - 353