Autonomous production tracking for augmenting output in off-site construction

被引:61
作者
Arashpour, Mehrdad [1 ]
Wakefield, Ron [1 ]
Blismas, Nick [1 ]
Maqsood, Tayyab [1 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic 3000, Australia
关键词
Autonomous control; Construction management; Flexible capacity; Lean production; Off-site construction; Production planning; Simulation; Workflow; BUILDING SYSTEMS; DESIGN; FLOW; OPTIMIZATION; MANAGEMENT; BUFFERS; IMPACT;
D O I
10.1016/j.autcon.2015.03.013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonlinear in the outcome due to the presence of variability (ii) in systems with a periodic production target, deviation from the schedule converges to zero at the end of production period and the same downward trend should be followed in designing plan buffers and (iii) long-term production performance in off-site construction can autonomously be monitored and controlled by observing critical variables of production. The paper provides those who manage off-site construction with recommendations on effective production tracking and management. The models and propositions in this research are of practical value and can be used to detect impending production shortfalls against periodic targets in the short-term, and adjust capacity parameters and production targets in long-term planning. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:13 / 21
页数:9
相关论文
共 60 条
[1]   LOB and CPM Integrated Method for Scheduling Repetitive Projects [J].
Ammar, Mohammad A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :44-50
[2]  
[Anonymous], CIB WORLD BUILD C 20
[3]  
[Anonymous], 2012, 37 ANN C AUSTR U BUI
[4]  
[Anonymous], P NSF HOUS RES AG WO
[5]  
[Anonymous], 2000, THESIS U BIRMINGHAM
[6]  
[Anonymous], 2013, STAT METHODS SURVIVA
[7]   A New Approach for Modelling Variability in Residential Construction Projects [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Blismas, Nick ;
Lee, Eric Wai Ming .
CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (02) :83-92
[8]  
Arashpour M, 2012, CONSTR ECON BUILD, V12, P1
[9]   Optimization of process integration and multi-skilled resource utilization in off-site construction [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Blismas, Nick ;
Minas, James .
AUTOMATION IN CONSTRUCTION, 2015, 50 :72-80
[10]   Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Blismas, Nick ;
Lee, E. W. M. .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (12) :995-1004