Scheduling of uniform parallel machines with s-precedence constraints

被引:5
作者
Kim, Eun-Seok [1 ]
机构
[1] City Univ London, Cass Business Sch, London EC1Y 8TZ, England
关键词
Uniform parallel machine scheduling; Precedence constraints; Weighted total completion time; Heuristic;
D O I
10.1016/j.mcm.2011.03.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers a problem of scheduling s-precedence constrained jobs on machines in parallel which have different speeds. The objective is to minimize the weighted total completion time. The s-precedence relation between two jobs i and j represents the situation where job j is constrained from processing until job i starts processing, which is different from the standard definition of a precedence relation where j cannot start until i completes. An LP-based heuristic procedure is derived for the problem. Numerical experiments are conducted to show that the derived heuristic finds effective solutions. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:576 / 583
页数:8
相关论文
共 50 条
[21]   Approximating total weighted completion time on identical parallel machines with precedence constraints and release dates [J].
Jaeger, Sven .
OPERATIONS RESEARCH LETTERS, 2018, 46 (05) :505-509
[22]   SCHEDULING PROBLEMS WITH PRECEDENCE CONSTRAINTS: MODELS AND ALGORITHMS [J].
Montemanni, Roberto .
EUROPEAN SIMULATION AND MODELLING CONFERENCE 2012, 2012, :5-12
[23]   Shop scheduling problems under precedence constraints [J].
Strusevich, VA .
ANNALS OF OPERATIONS RESEARCH, 1997, 69 (0) :351-377
[24]   A monotone approximation algorithm for scheduling with precedence constraints [J].
Krumke, Sven O. ;
Schwahn, Anne ;
van Stee, Rob ;
Westphal, Stephan .
OPERATIONS RESEARCH LETTERS, 2008, 36 (02) :247-249
[25]   Unrelated Parallel Machine Scheduling Problem with Precedence Constraints: Polyhedral Analysis and Branch-and-Cut [J].
Hassan, Mohammed-Albarra ;
Kacem, Imed ;
Martin, Sebastien ;
Osman, Izzeldin M. .
COMBINATORIAL OPTIMIZATION, ISCO 2016, 2016, 9849 :308-319
[26]   BI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING PROBLEM WITH WORKER ALLOCATION AND SEQUENCE DEPENDENT SETUP TIMES CONSIDERING MACHINE ELIGIBILITY AND PRECEDENCE CONSTRAINTS [J].
Foroutan, Reza Alizadeh ;
Rezaeian, Javad ;
Shafipour, Milad .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2023, 19 (01) :402-436
[27]   Multiobjective Order Acceptance and Scheduling on Unrelated Parallel Machines with Machine Eligibility Constraints [J].
Wang, Bailin ;
Wang, Haifeng .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
[28]   APPROXIMATION SCHEMES FOR SCHEDULING JOBS WITH CHAIN PRECEDENCE CONSTRAINTS [J].
Jansen, Klaus ;
Solis-Oba, Roberto .
INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2010, 21 (01) :27-49
[29]   Multiprocessor scheduling under precedence constraints: Polyhedral results [J].
Coll, PE ;
Ribeiro, CC ;
de Souza, CC .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (05) :770-801
[30]   Scheduling linearly shortening jobs under precedence constraints [J].
Gawiejnowicz, Stanislaw ;
Lai, Tsung-Chyan ;
Chiang, Ming-Huang .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) :2005-2015