Quality control of double fluid jet grouting below groundwater table: Case history

被引:39
作者
Ni, James C. [1 ]
Cheng, Wen-Chieh [2 ]
机构
[1] Natl Taipei Univ Technol, Dept Civil Engn, Taipei 10608, Taiwan
[2] Natl Taipei Univ Technol, Coll Engn, Taipei 10608, Taiwan
关键词
Double fluid jet grouting; Spoil density; Spoil flow rate; Column diameter; Infill column;
D O I
10.1016/j.sandf.2014.11.001
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A jet gout block created by overlapping columns aimed to convert the saturated silty sand soils into a sale space for breaking down four underground parking uplift piles along the tunnel alignment. Since the grouting platform was located on the mat foundation in the basement of underground parking and was under the groundwater table, a series of dewatering wells were installed before the 177 columns were constructed to prevent intrusion of the groundwater flowing upward from sandy soil to basement through grouting hole during wash boring and grouting stages from happening. Several quality control measures were undertaken prior to quality assurance testing. Two measurements of spoil return and spoil flow rate for each column were implemented. From a back analysis from the mean values of spoil density and spoil flow rate, the column diameter was estimated at around 1.56 m, slightly smaller than the design diameter by 2.5%, In addition, a control chart with upper and lower control limits, established from a large dataset of flow rate of spoil return, was a means to recognize the likelihood of sand boiling and to serve as an early warning indicator of abnormal conditions for the jet grouting works below the groundwater table. As the mean spoil density of the infill column was larger than perimeter column, an optimal grouting sequence for clusters was suggested in this paper. The jet grout block exposed during the breakdown process of the piles showed safe working conditions as required and a shield machine then passed through as planned, (C) 2014 The Japanese Geotechnical Society. Production and hosting by Elsevier B.V. All rights reserved.
引用
收藏
页码:1039 / 1053
页数:15
相关论文
共 22 条
  • [1] [Anonymous], 1956, Statistical Quality Control Handbook
  • [2] Design of jet-grouting cut-offs
    Croce, P.
    Modoni, G.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2007, 11 (01) : 11 - 19
  • [3] Analysis of single-fluid jet grouting
    Croce, P
    Flora, A
    [J]. GEOTECHNIQUE, 2000, 50 (06): : 739 - 748
  • [4] Croce P., 1998, REV ITALIANA GEOTECN, V2, P5
  • [5] A semi-probabilistic approach to the design of jet grouted umbrellas in tunnelling
    Flora, A.
    Lignola, G. P.
    Manfredi, G.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2007, 11 (04) : 207 - 217
  • [6] Flora A., 2012, 4 INT C GROUT DEEP M
  • [7] Ho C.E., 2011, GSP AM SOC CIVIL ENG
  • [8] Hurley T., 2010, EARTH RETENTION C 3, P417
  • [9] Hurley T.M., 2005, SOIL STABILIZATION J
  • [10] JJGA, 2002, JET GROUT TECHN INF