FACTORS AFFECTING CONSTRUCTION COST OF AC OVERLAY IN LIFE-CYCLE COST ANALYSIS

被引:0
作者
Wang, Y. [1 ]
Wang, G. [1 ]
机构
[1] E Carolina Univ, Dept Construct Management, Greenville, NC 27858 USA
来源
TRANSPORTATION AND URBAN SUSTAINABILITY | 2010年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Every year, highway transportation agencies in the US spend billions of dollars on resurfacing asphalt pavements. The agencies need to decide the timing of resurfacing and overlay thickness design. Currently, many agencies use the life-cycle cost analysis (LCCA) procedure to make pavement design and management decisions. However, the validity of the procedure depends on some basic assumptions of LCCA, particularly the road user cost, the projected overlay performance, and the future construction cost. By using construction data from Kentucky Transportation Cabinet (KyTC), the authors of this paper reviewed the cost components of a typical resurfacing project and examined how they are affected by the future diesel and asphalt prices. The authors also developed an overlay performance prediction model based on data from the Long-term Pavement Performance Program (LTPP). The cost and performance models developed in this study can assist the KyTC in optimizing pavement resurfacing decisions.
引用
收藏
页码:765 / 772
页数:8
相关论文
共 50 条
[41]   Operational Life-Cycle Assessment and Life-Cycle Cost Analysis for Water Use in Multioccupant Buildings [J].
Arpke, Angela ;
Hutzler, Neil .
JOURNAL OF ARCHITECTURAL ENGINEERING, 2005, 11 (03) :99-109
[42]   Evaluating the effect of the accelerated construction method on project life-cycle cost [J].
Ehab El-Far, Mohamed ;
Sabry, Reda Abass ;
Kotb, Mostafa .
INFRASTRUCTURE ASSET MANAGEMENT, 2023, 10 (03) :126-143
[43]   Barriers affecting implementation of life cycle cost analysis in construction projects: SEM approach [J].
Altaf, Muhammad ;
Alaloul, Wesam Salah ;
Musarat, Muhammad Ali ;
Mostafa, Sherif ;
Stewart, Rodney ;
Hussain, Ali ;
Rabbani, Muhammad Babar Ali ;
Saad, Syed ;
Ammad, Syed .
INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (02)
[44]   Barriers affecting implementation of life cycle cost analysis in construction projects: SEM approach [J].
Muhammad Altaf ;
Wesam Salah Alaloul ;
Muhammad Ali Musarat ;
Sherif Mostafa ;
Rodney Stewart ;
Ali Hussain ;
Muhammad Babar Ali Rabbani ;
Syed Saad ;
Syed Ammad .
Innovative Infrastructure Solutions, 2024, 9
[45]   RELIABILITY INVESTMENT AND LIFE-CYCLE COST [J].
SEGER, JK .
IEEE TRANSACTIONS ON RELIABILITY, 1983, 32 (03) :259-263
[46]   Monobores improve life-cycle cost [J].
不详 .
JOURNAL OF PETROLEUM TECHNOLOGY, 1999, 51 (02) :69-70
[47]   LIFE-CYCLE COST - A MODEL AND APPLICATIONS [J].
HEDGE, GG .
IIE TRANSACTIONS, 1994, 26 (06) :56-62
[48]   MODELING TOTAL LIFE-CYCLE COST [J].
BHADURY, B ;
BASU, SK .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 1986, 200 (01) :31-40
[49]   LIFE-CYCLE SYSTEM COST EFFECTIVENESS [J].
PETERSON, E .
PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1974, 7 (02) :48-51
[50]   LIFE-CYCLE COST OF LIFTING APPLIANCES [J].
KOGAN, J .
PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1979, (NSYM) :28-33