Integrated resource management for simultaneous project selection and scheduling

被引:43
作者
Shariatmadari, Mohammad [1 ]
Nahavandi, Nasim [1 ]
Zegordi, Seyed Hessameddin [1 ]
Sobhiyah, Mohammad Hossein [2 ]
机构
[1] Tarbiat Modares Univ, Fac Ind & Syst Engn, POB 14115 143, Tehran, Iran
[2] Tarbiat Modares Univ, Fac Arts & Architecture, Project & Construct Management Grp, POB 14155 4838, Tehran, Iran
关键词
Integrated Resource Management (IRM); Project selection; Project scheduling; Resource Investment Problem (RIP); Gravitational Search Algorithm (GSA); GRAVITATIONAL SEARCH ALGORITHM; TIME; COST;
D O I
10.1016/j.cie.2017.04.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Nowadays, resource management is one of the most critical decision making processes in project-oriented companies. To reach the highest level of profitability, these companies should consider profiting from available projects and optimal management of their (renewable and nonrenewable) resources in terms of selection and scheduling of the most optimal project portfolio. In this regard, this paper presents the Integrated Resource Management (IRM) approach for simultaneous project selection and scheduling. A mixed-integer programming model is also proposed for the approach. To solve the research problem, first a heuristic algorithm is developed for generating feasible initial solutions; then a method for improving the resulted solutions is presented based on Gravitational Search Algorithm (GSA). Finally, the proposed method is compared with Lingo on a set of 270 test problems. The comparison demonstrates that the proposed method outperforms Lingo in most cases and has less time complexity. Also, it will be shown that using IRM approach in test problems improves average profitability by 13.2%. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:39 / 47
页数:9
相关论文
共 27 条
  • [1] Multi-mode resource availability cost problem with recruitment and release dates for resources
    Afshar-Nadjafi, Behrouz
    [J]. APPLIED MATHEMATICAL MODELLING, 2014, 38 (21-22) : 5347 - 5355
  • [2] [Anonymous], 2016, OPER RES
  • [3] Aquilano N.J., 1980, J OPER MANAG, V1, P57, DOI DOI 10.1016/0272-6963(80)90013-3
  • [4] Static R&D project portfolio selection in public organizations
    Arratia M, N. M.
    Lopez, F., I
    Schaeffer, S. E.
    Cruz-Reyes, L.
    [J]. DECISION SUPPORT SYSTEMS, 2016, 84 : 53 - 63
  • [5] Project selection, scheduling and resource allocation with time dependent returns
    Chen, Jiaqiong
    Askin, Ronald G.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (01) : 23 - 34
  • [6] Integrated project scheduling and material planning with variable activity duration and rewards
    Dodin, B
    Elimam, AA
    [J]. IIE TRANSACTIONS, 2001, 33 (11) : 1005 - 1018
  • [7] Project selection and scheduling with uncertain net income and investment cost
    Huang, Xiaoxia
    Zhao, Tianyi
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2014, 247 : 61 - 71
  • [8] Resource constrained project scheduling problem with discounted earliness-tardiness penalties: Mathematical modeling and solving procedure
    Khoshjahan, Yazdan
    Najafi, Amir Abbas
    Afshar-Nadjafi, Behrouz
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (02) : 293 - 300
  • [9] Strategic bidding using fuzzy adaptive gravitational search algorithm in a pool based electricity market
    Kumar, J. Vijaya
    Kumar, D. M. Vinod
    Edukondalu, K.
    [J]. APPLIED SOFT COMPUTING, 2013, 13 (05) : 2445 - 2455
  • [10] Capital- and resource-constrained project scheduling with net present value optimization
    Leyman, Pieter
    Vanhoucke, Mario
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 256 (03) : 757 - 776