A branch and bound algorithm for hoist scheduling of a circuit board production line

被引:48
|
作者
Ng, WC
机构
[1] Department of Applied Statistics and Operational Research, City University of Hong Kong, Kawloon, Tat Chee Avenue
来源
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS | 1996年 / 8卷 / 01期
关键词
branch and bound algorithm; cyclic hoist scheduling; time window constraints;
D O I
10.1007/BF00167800
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The article studies the scheduling problem of a material handling hoist in a circuit board production line. The existing models for the problem assume that the times required to perform inter-tank moves are given constants. However, as shown in a simple example, the optimal solutions obtained under this assumption may not be the actual optimal solutions. In this article the times for inter-tank moves are decision variables of a mixed integer program proposed for the problem. An efficient branch and bound algorithm is developed for solving the problem optimally. A numerical example is used to illustrate the algorithm. Computational experience with benchmark problems and randomly generated test problems is discussed.
引用
收藏
页码:45 / 65
页数:21
相关论文
共 50 条