A branch and bound algorithm for hoist scheduling of a circuit board production line
被引:48
|
作者:
Ng, WC
论文数: 0引用数: 0
h-index: 0
机构:Department of Applied Statistics and Operational Research, City University of Hong Kong, Kawloon, Tat Chee Avenue
Ng, WC
机构:
[1] Department of Applied Statistics and Operational Research, City University of Hong Kong, Kawloon, Tat Chee Avenue
来源:
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS
|
1996年
/
8卷
/
01期
关键词:
branch and bound algorithm;
cyclic hoist scheduling;
time window constraints;
D O I:
10.1007/BF00167800
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
The article studies the scheduling problem of a material handling hoist in a circuit board production line. The existing models for the problem assume that the times required to perform inter-tank moves are given constants. However, as shown in a simple example, the optimal solutions obtained under this assumption may not be the actual optimal solutions. In this article the times for inter-tank moves are decision variables of a mixed integer program proposed for the problem. An efficient branch and bound algorithm is developed for solving the problem optimally. A numerical example is used to illustrate the algorithm. Computational experience with benchmark problems and randomly generated test problems is discussed.