摘要
The article studies the scheduling problem of a material handling hoist in a circuit board production line. The existing models for the problem assume that the times required to perform inter-tank moves are given constants. However, as shown in a simple example, the optimal solutions obtained under this assumption may not be the actual optimal solutions. In this article the times for inter-tank moves are decision variables of a mixed integer program proposed for the problem. An efficient branch and bound algorithm is developed for solving the problem optimally. A numerical example is used to illustrate the algorithm. Computational experience with benchmark problems and randomly generated test problems is discussed.
引用
收藏
页码:45 / 65
页数:21
相关论文
共 9 条
[1]  
ARMSTRONG R, 1992, 9207 RUTG U
[2]  
Baptiste P., 1993, APPL ARTIF INTELL, V2, P599
[3]  
HANEN C, 1994, P 4 INT C PROJ MANG, P108
[4]   THE MINIMUM COMMON-CYCLE ALGORITHM FOR CYCLIC SCHEDULING OF 2 MATERIAL HANDLING HOISTS WITH TIME WINDOW CONSTRAINTS [J].
LEI, L ;
WANG, TJ .
MANAGEMENT SCIENCE, 1991, 37 (12) :1629-1639
[5]  
LEI L, 1989, 890006 RUTG U
[6]  
MANIER MA, 1994, P 4 INT C PROJ MAN S, P110
[7]  
Phillips L. W., 1976, AIIE Transactions, V8, P219, DOI 10.1080/05695557608975070
[8]   HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY [J].
SHAPIRO, GW ;
NUTTLE, HLW .
IIE TRANSACTIONS, 1988, 20 (02) :157-167
[9]  
SHAPIRO GW, 1985, THESIS N CAR STAT U