A discrete Jaya algorithm for permutation flow-shop scheduling problem

被引:15
作者
Mishra, Aseem K. [1 ]
Pandey, Divya [1 ]
机构
[1] Shiv Nadar Univ, Dept Mech Engn, NH 91 Tehsil Dadri, Gautam Buddha Nagar 201314, Uttar Pradesh, India
关键词
Jaya algorithm; Permutation flow-shop scheduling problem; Makespan minimization; DIFFERENTIAL EVOLUTION; M-MACHINE; OPTIMIZATION; SHOP; MINIMIZE; TLBO;
D O I
10.5267/j.ijiec.2019.12.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Jaya algorithm has recently been proposed, which is simple and efficient meta-heuristic optimization technique and has received a great attention in the world of optimization. It has been successfully applied to some thermal, design and manufacturing associated optimization problems. This paper aims to analyze the performance of Jaya algorithm for permutation flow-shop scheduling problem which is a well-known NP-hard optimization problem. The objective is to minimize the makespan. First, to make Jaya algorithm adaptive to the problem, a random priority is allocated to each job in a permutation sequence. Second, a job priority vector is converted into job permutation vector by means of Largest Order Value (LOV) rule. An exhaustive comparative study along with statistical analysis is performed by comparing the results with public benchmarks and other competitive heuristics. The key feature of Jaya algorithm of simultaneous movement towards the best solution and going away from the worst solution enables it to avoid being trapped in the local optima. Furthermore, the uniqueness of Jaya algorithm compared with any other evolutionary based optimization technique is that it is totally independent of specific parameters. This substantially reduces the computation effort and numerical complexity. Computational results reveal that Jaya algorithm is efficient in most cases and has considerable potential for permutation flow-shop scheduling problems. (C) 2020 by the authors; licensee Growing Science, Canada
引用
收藏
页码:415 / 428
页数:14
相关论文
共 36 条
[1]   Application of JAYA algorithm for the optimization of machining performance characteristics during the turning of CFRP (epoxy) composites: comparison with TLBO, GA, and ICA [J].
Abhishek, Kumar ;
Kumar, V. Rakesh ;
Datta, Saurav ;
Mahapatra, Siba Sankar .
ENGINEERING WITH COMPUTERS, 2017, 33 (03) :457-475
[2]   Testing the performance of teaching-learning based optimization (TLBO) algorithm on combinatorial problems: Flow shop and job shop scheduling cases [J].
Baykasoglu, Adil ;
Hamzadayi, Alper ;
Kose, Simge Yelkenci .
INFORMATION SCIENCES, 2014, 276 :204-218
[3]  
Buddala Raviteja, 2018, Journal of Industrial Engineering International, V14, P555, DOI 10.1007/s40092-017-0244-4
[4]   Efficiency of Jaya algorithm for solving the optimization-based structural damage identification problem based on a hybrid objective function [J].
Dinh-Cong Du ;
Ho-Huu Vinh ;
Vo-Duy Trung ;
Ngo-Thi Hong Quyen ;
Nguyen-Thoi Trung .
ENGINEERING OPTIMIZATION, 2018, 50 (08) :1233-1251
[5]   A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems [J].
Engin, Orhan ;
Guclu, Abdullah .
APPLIED SOFT COMPUTING, 2018, 72 :166-176
[6]  
Gao K., 2016, 14 INT C CONTR AUT R, V2016, P13
[7]  
Guo J, 2017, CHIN CONT DECIS CONF, P6010, DOI 10.1109/CCDC.2017.7978247
[8]   Flowshop-scheduling problems with makespan criterion: a review [J].
Hejazi, SR ;
Saghafian, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (14) :2895-2929
[9]  
Kan AHG Rinnooy, 2012, Machine Sequencing Problem: Classification, Complexity and Computation
[10]   An efficient flow-shop scheduling algorithm based on a hybrid particle swarm optimization model [J].
Kuo, I-Hong ;
Horng, Shi-Jinn ;
Kao, Tzong-Wann ;
Lin, Tsung-Lieh ;
Lee, Cheng-Ling ;
Terano, Takao ;
Pan, Yi .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) :7027-7032