LOD standardization for construction site elements

被引:10
作者
Cassano, Manuele [1 ]
Trani, Marco L. [1 ]
机构
[1] Politecn Milan, ABC Dept, Via Ponzio 31, I-20133 Milan, MI, Italy
来源
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017 | 2017年 / 196卷
关键词
BIM; Construction Site; CoSIM; Design phases;
D O I
10.1016/j.proeng.2017.08.062
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the last years an increasing attention to the information management in construction is visible. The advent and the continuous development of BIM applications permitted to focus more on this issue and to transform the way of design and manage construction. As known the management of a project is divided in different phases from the early draft to the management of the maintenance. Each of this phase need a different level of information development and also a different graphic detail according to the need of each project. International standards developed different scales for these two issues such as the LOD scale of the American Institute of Architects, taken as guideline in different standards. Since the need of developing a proper construction site plan during each phase of the design process, the level of development of construction elements need to be standardized as well. The paper presents then the development of a LOD scale for construction site elements such as equipment, temporary structures, etc. In particular it considers the phases between the draft design and the detailed design, developed by a client designer. In addition to this it considers the construction phase developed by contractors for the installation design. This according to the systematic approach proposed in an earlier report of research. In fact the research consisted in the analysis of each design phase in order to evaluate the exigencies in terms of information and graphic detail. The postulated LOD scale has been then developed also modelling a reasonable number of elements and tested in the design of real case studies. As a result the findings of this research are inserted in the Italian Standard UNI 11337-4 about the digital management of construction processes and the information development of models, deliverables and objects (c) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:1057 / 1064
页数:8
相关论文
共 50 条
  • [41] Emergency Decision at the Construction Site Based on Emergency Plans
    Wang Guoxian
    Lu Huimin
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1397 - 1402
  • [42] A REVIEW ON THE BENEFITS, BARRIERS OF THE DRONE EMPLOYMENT IN THE CONSTRUCTION SITE
    Alsamarraie, Mundher
    Ghazali, Farid
    Hatem, Zaid M.
    Flaih, Alhamza Yassin
    JURNAL TEKNOLOGI-SCIENCES & ENGINEERING, 2022, 84 (02): : 121 - 131
  • [43] Application of RFID Technology on Construction Site - Case Study
    Spisakova, Marcela
    Kozlovska, Maria
    VIII INTERNATIONAL SCIENTIFIC SIBERIAN TRANSPORT FORUM, VOL 2, 2020, 1116 : 29 - 36
  • [44] GREEN SITE MANAGEMENT PRACTICES IN THE MALAYSIAN CONSTRUCTION SITES
    Jing, Khoo Terh
    Shafiei, Mohd Wira Mohd
    Yee, Ha Chin
    Ismail, Radzi
    INTERNATIONAL JOURNAL OF MANAGEMENT STUDIES, 2024, 31 (02): : 605 - 630
  • [45] Genetic algorithm optimization for dynamic construction site layout planning
    Farmakis, Panagiotis M.
    Chassiakos, Athanasios P.
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1655 - 1664
  • [46] A construction site work management system that uses mobile phones
    Kuang, Zhongli
    Shimada, Hiroumi
    Kanazawa, Yuji
    Tsuboi, Takahiko
    Goto, Takaaki
    Nakagawa, Yoshitaka
    Tsuchida, Kensei
    IC-BNMT 2007: Proceedings of 2007 International Conference on Broadband Network & Multimedia Technology, 2007, : 51 - 56
  • [47] Vegetative Swale for Treatment of Stormwater Runoff from Construction Site
    Ismail, A. F.
    Sapari, N.
    Wahab, Abdul M. M.
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2014, 22 (01): : 55 - 64
  • [48] A LoRaWAN Multi-Technological Architecture for Construction Site Monitoring
    Ragnoli, Mattia
    Colaiuda, Davide
    Leoni, Alfiero
    Ferri, Giuseppe
    Barile, Gianluca
    Rotilio, Marianna
    Laurini, Eleonora
    De Berardinis, Pierluigi
    Stornelli, Vincenzo
    SENSORS, 2022, 22 (22)
  • [49] Evaluation model of construction site personnel management based on FAHP
    Cui, Liwen
    Chen, YongFeng
    PROCEEDINGS OF THE 2015 3RD INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, ARTS, ECONOMICS AND SOCIAL SCIENCE, 2016, 49 : 1441 - 1445
  • [50] Probabilistic Fire Risk Framework for Optimizing Construction Site Layout
    El Meouche, Rani
    Abunemeh, Mohammed
    Hijazi, Ihab
    Mebarki, Ahmed
    Fatayer, Fadi
    Issa, Amjad
    SUSTAINABILITY, 2020, 12 (10)