Simulation of concrete batch plant production

被引:68
|
作者
Zayed, TM [1 ]
Halpin, D [1 ]
机构
[1] Purdue Univ, Sch Civil Engn, Div Costr Engn & Mgmt, W Lafayette, IN 47907 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2001年 / 127卷 / 02期
关键词
Construction industry - Decision making - Plant management - Resource allocation;
D O I
10.1061/(ASCE)0733-9364(2001)127:2(132)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The decision-making process is a very essential part of any construction operation. Simulation can be used as a tool to assist construction managers in making informed decisions. In this paper, simulation is applied to concrete batching operations to analyze alternative solutions and resource management. Data are collected to define activity durations for the plant. A simulation model is constructed for the plant using the MicroCYCLONE simulation system. Based on sensitivity analysis, management tools are constructed to help the decision maker. These tools are a time-cost-quantity chart, a feasible region analysis, and a contour lines chart. Time-cost-quantity and contour lines charts are used for determining production time, production cost, and resources for a required distance from the plant. The feasible region chart is used for determining the range of alternative solutions that can be taken to minimize production time and cost of the available plant resources, according to the required transportation distance.
引用
收藏
页码:132 / 141
页数:10
相关论文
共 50 条