Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan

被引:0
作者
Shaikh, Fazal Ali [1 ]
机构
[1] Univ Sindh, Dept Econ, Jamshoro, Pakistan
关键词
cost overrun; time overrun; Pakistan; finance management; factors;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One important and well-known issue for the majority of construction projects such as buildings, roads, bridges, airports and many more projects all over the world is time and cost overrun. Project pricing and time period delay are also major issues. The current investigation is taking into consideration the mega construction projects in the provinces of Pakistan, looking into various components controlling and dominating time and cost overrun. A total of 29 factors were identified from literature work and one questionnaire was designed and distributed among 160 respondents. All collected data were analyzed by the average index method. Factors having value more than 3.6 were selected as main factors of cost and time overrun, and five factors were revealed to surpass this barrier. Time and cost overrun are of the leading financial mismanagement issues of the economy of Pakistan. This study will be helpful for stakeholders to control both cost and time overrun in the mega construction projects of Pakistan.
引用
收藏
页码:5247 / 5250
页数:4
相关论文
共 22 条
  • [1] Abas N., 2011, CIBW099 PREVENTION M
  • [2] Knowledge-Based Energy Damage Model for Evaluating Industrialised Building Systems (IBS) Occupational Health and Safety (OHS) Risk
    Abas, Nor Haslinda
    Blismas, Nick
    Lingard, Helen
    [J]. 3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING FOR SUSTAINABILITY (ICONCEES 2015), 2016, 47
  • [3] Ahmed S. M., 2003, ASC 39 ANN C CLEMS U
  • [4] A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia's construction industry
    Amin, M. A. Mohd
    Abas, N. H.
    Shahidan, S.
    Rahmat, M. H.
    Suhaini, N. A.
    Nagapan, S.
    Rahim, R. Abdul
    [J]. GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [5] [Anonymous], 2003, 9 E AS PAC C STRUCT
  • [6] [Anonymous], INT C CONSTR PROJ MA
  • [7] Azhar N.F., 2008, P 1 INT C CONSTRUCTI
  • [8] Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects
    Bari, Nor Azmi Ahmad
    Yusuff, Rosnah
    Ismail, Napsiah
    Jaapar, Aini
    Ahmad, Norizan
    [J]. AICE-BS 2011 FAMAGUSTA (ASIA PACIFIC INTERNATIONAL CONFERENCE ON ENVIRONMENT-BEHAVIOUR STUDIES), 2012, 35 : 689 - 696
  • [9] Frimpong Y., 2003, International Journal of Project Management, V21, P321, DOI 10.1016/S0263-7863(02)00055-8
  • [10] Analysis of Causes of Delay and Time Performance in Construction Projects
    Gonzalez, Pablo
    Gonzalez, Vicente
    Molenaar, Keith
    Orozco, Francisco
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)