Evaluating the Impact of Building Information Modeling (BIM) on Mass House Building Projects

被引:30
作者
Sarvari, Hadi [1 ]
Chan, Daniel W. M. [2 ]
Rakhshanifar, Mansooreh [3 ]
Banaitiene, Nerija [4 ]
Banaitis, Audrius [4 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Isfahan Khorasgan Branch, Esfahan 8159539998, Iran
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Hong Kong, Peoples R China
[3] Univ Teknol Malaysia, Fac Civil Engn, Johor Baharu 81310, Skudai, Malaysia
[4] Vilnius Gediminas Tech Univ, Dept Construct Management & Real Estate, Sauletekio Al 11, LT-10793 Vilnius, Lithuania
关键词
building information modeling; mass house building project; quality; cost; time; MANAGEMENT FRAMEWORK; CONSTRUCTION; TECHNOLOGY; INDUSTRY;
D O I
10.3390/buildings10020035
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper aims to identify and investigate the factors affecting the goals of mass-housing building projects due to the use of building information modeling (BIM). A descriptive-survey method was used to collect necessary data. Fifty respondents from the target sectors and experts in the field of modeling building information participated in self-selection survey. The tools of collecting data included three questionnaires regarding three phases of construction work: pre-construction, during construction and post-construction, which were developed based on the three indices of cost, time and quality. The face, content and construct validity of the questionnaires were confirmed after several rounds of testing. The reliability coefficient of the pre-construction, during the construction and post-construction questionnaires were 0.923, 0.917 and 0.876, respectively. The results show that the F-statistic is significant for the difference between the three groups (pre-construction, during construction and post-construction) at the 0.01 level. The results confirmed that BIM has a great influence on a project in terms of meeting time, cost and quality objectives through the whole life cycle of a construction project: during pre-construction, construction, and post-construction stages.
引用
收藏
页数:16
相关论文
共 79 条
[71]  
Smith D., 2007, Journal of Building Information Modeling, P12
[72]  
Stanford HerbertW., 2019, ANAL DESIGN HEATING
[73]   Construction Costs Analysis And Its Importance To The Economy [J].
Stasiak-Betlejewska, Renata ;
Potkany, Marek .
INTERNATIONAL SCIENTIFIC CONFERENCE: BUSINESS ECONOMICS AND MANAGEMENT (BEM2015), 2015, 34 :35-42
[74]  
Taihairan RBR, 2015, INT J SUSTAIN CONSTR, V6, P62
[75]   The use of a BIM-based framework to support safe facility management processes [J].
Wetzel, Eric M. ;
Thabet, Walid Y. .
AUTOMATION IN CONSTRUCTION, 2015, 60 :12-24
[76]  
Wong JKW., 2018, Build. Inf. Syst. Constr. Ind, DOI DOI 10.2495/SDP-V13-N1-108-120
[77]   Risk in Implementing Building Information Modelling (BIM) in Malaysia Construction Industry: A Review [J].
Ya'acob, Ibtisam Azwani Mat ;
Rahim, Faizul Azli Mohd ;
Zainon, Nurshuhada .
INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2018), 2018, 65
[78]   A BIM-based dynamic model for site material supply [J].
Yu, Qunzhou ;
Li, Kaiman ;
Luo, Hanbin .
5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 :526-533
[79]   A review of risk management through BIM and BIM-related technologies [J].
Zou, Yang ;
Kiviniemi, Arto ;
Jones, Stephen W. .
SAFETY SCIENCE, 2017, 97 :88-98