On heuristic solutions for the stochastic flowshop scheduling problem

被引:0
|
作者
Framinan, Jose M. [1 ]
Perez-Gonzalez, Paz [1 ]
机构
[1] Univ Seville, Ind Management, Seville, Spain
来源
PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013) | 2013年
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We address the problem of scheduling jobs in a flowshop when their processing times adopt a given distribution (stochastic flowshop scheduling problem), for which optimal solutions exist only for very specific cases. Consequently, some heuristics have been proposed, all of them with similar performance. In our paper, we first focus on the critical issue of estimating the expected makespan of a sequence and found that, for instances with a medium/large variability (expressed as the coefficient of variation of the processing times of the jobs), the number of samples or simulation runs used in the literature may not be sufficient to derive robust conclusions. We thus propose a procedure with a variable number of iterations that ensures that the error in the estimation of the expected makespan is bounded within a small percentage with a very high probability. Using this procedure, we test the main heuristics proposed in the literature and find significant differences in their performance, in contrast with existing studies. We also find that the deterministic counterpart of the most efficient heuristic for the stochastic problem performs extremely well for most settings, which indicates that (at least within the limitations of our study), a practical way to solve the stochastic problem may be to simplify it to its deterministic version.
引用
收藏
页码:102 / 108
页数:7
相关论文
共 50 条
  • [31] HEURISTIC ALGORITHMS FOR SCHEDULING N JOBS IN FLOWSHOP
    GUPTA, JND
    MAYKUT, AR
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1973, 16 (03) : 131 - 150
  • [32] A SIMULATED ANNEALING HEURISTIC FOR SCHEDULING IN A FLOWSHOP WITH BICRITERIA
    GANGADHARAN, R
    RAJENDRAN, C
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) : 473 - 476
  • [33] HEURISTIC ALGORITHMS FOR SCHEDULING IN THE NO-WAIT FLOWSHOP
    GANGADHARAN, R
    RAJENDRAN, C
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (03) : 285 - 290
  • [34] AN EFFICIENT HEURISTIC APPROACH TO THE SCHEDULING OF JOBS IN A FLOWSHOP
    RAJENDRAN, C
    CHAUDHURI, D
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 61 (03) : 318 - 325
  • [35] A MODIFIED HEURISTIC FOR AN INITIAL SEQUENCE IN FLOWSHOP SCHEDULING
    KARIMI, I
    KU, HM
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1988, 27 (09) : 1654 - 1658
  • [36] HEURISTIC ALGORITHMS FOR CONTINUOUS FLOWSHOP PROBLEM
    RAJENDRAN, C
    CHAUDHURI, D
    NAVAL RESEARCH LOGISTICS, 1990, 37 (05) : 695 - 705
  • [37] A linear programming based heuristic for solving a two-stage flowshop scheduling problem
    Figielska, Ewa
    ETFA 2007: 12TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOLS 1-3, 2007, : 392 - 397
  • [38] A Variable Block Insertion Heuristic for the Blocking Flowshop Scheduling Problem with Total Flowtime Criterion
    Tasgetiren, Mehmet Fatih
    Pan, Quan-Ke
    Kizilay, Damla
    Gao, Kaizhou
    ALGORITHMS, 2016, 9 (04):
  • [39] Lookahead batching heuristic for batch scheduling problem of two-stage hybrid flowshop
    Chi Y.
    Liu J.
    Chen Q.
    Mao N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10): : 2559 - 2570
  • [40] New heuristic for the flowshop scheduling problem in the presence of bottleneck machine. A performance study
    Han, Wenxue
    Dejax, Pierre
    Proceeding of the Transformation of Science and Technology into Productive Power, 1991,