Efficiency-Oriented Production Scheduling Scheme: An Ant Colony System Method

被引:6
作者
Wan, Yi [1 ,2 ,3 ,4 ]
Zuo, Tian-yu [4 ]
Chen, Lin [2 ]
Tang, Wen-Cheng [3 ,4 ]
Chen, Jin [4 ,5 ]
机构
[1] Nanjing Xiaozhuang Univ, Sch Environm Sci, Nanjing 211171, Peoples R China
[2] Jiangsu Shentong Valve Co Ltd, Nantong 226232, Peoples R China
[3] Southeast Univ, Sch Mech Engn, Nanjing 211189, Peoples R China
[4] Sanjiang Univ, Sch Mech & Elect Engn, Nanjing 210012, Peoples R China
[5] Nanjing Univ Aeronaut & Astronaut, Sch Astronaut, Nanjing 211189, Peoples R China
来源
IEEE ACCESS | 2020年 / 8卷
基金
中国博士后科学基金;
关键词
Job shop scheduling; ant colony system; dynamic scheduling; event-driven; SEARCH ALGORITHM; OPTIMIZATION ALGORITHM; TABOO SEARCH; SHOP;
D O I
10.1109/ACCESS.2020.2968378
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the real production system, the scheduling scheme change is mostly changed by dynamic events or new tasks. Due to the different urgency degrees of dynamic events, the corresponding scheduling methods should be adopted to ensure the production efficiency of enterprises. In this paper, an event-driven dynamic workshop scheduling model is established based on Ant Colony System (ACS), and two scheduling methods are designed to deal with dynamic events, namely parallel scheduling and parallel priority scheduling, respectively. The goal of parallel scheduling is to minimize the total makespan, while that of parallel priority scheduling is to minimize the delivery time of dynamic events. Additionally, a selective scheduling strategy is designed to determine the optimal scheduling method according to the urgency degree of dynamic events. Finally, the feasibility of the selective scheduling strategy in solving the dual-objective dynamic job shop scheduling problem (DJSP) is verified by an example experiment on DJSP as well as a large scale problem test set.
引用
收藏
页码:19286 / 19296
页数:11
相关论文
共 45 条
  • [1] Rescheduling job shops under random disruptions
    Abumaizar, RJ
    Svestka, JA
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (07) : 2065 - 2082
  • [2] An Ant Colony System for energy-efficient dynamic Virtual Machine Placement in data centers
    Alharbi, Fares
    Tian, Yu-Chu
    Tang, Maolin
    Zhang, Wei-Zhe
    Peng, Chen
    Fei, Minrui
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2019, 120 : 228 - 238
  • [3] [Anonymous], BELG J OPER RES STAT
  • [4] Blum C., 2004, J MATH MODEL ALGORIT, V3, P285, DOI DOI 10.1023/B:JMMA.0000038614.39977.6F
  • [5] An improved ant system algorithm for the vehicle routing problem
    Bullnheimer, B
    Hartl, RF
    Strauss, C
    [J]. ANNALS OF OPERATIONS RESEARCH, 1999, 89 (0) : 319 - 328
  • [6] Job shop scheduling problem with alternative machines using genetic algorithms
    Chaudhry, I. A.
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (05) : 1322 - 1333
  • [7] Chen W., 2004, MODULAR MACH TOOL AU, P56
  • [8] Chen W., 2004, MODULAR MACH TOOL AU, P59
  • [9] Colorni A., 1994, BELGIAN J OPERATIONS, V34, P39
  • [10] Dorigo M., 1997, IEEE Transactions on Evolutionary Computation, V1, P53, DOI 10.1109/4235.585892