Estimation of Downside Risks in Project Portfolio Selection

被引:22
|
作者
Kettunen, Janne [1 ]
Salo, Ahti [2 ]
机构
[1] George Washington Univ, Dept Decis Sci, 2201 G St, Washington, DC 20052 USA
[2] Aalto Univ, Syst Anal Lab, POB 11100, Espoo 00076, Finland
基金
芬兰科学院;
关键词
project portfolio selection; research and development; optimization; simulation; JUDGMENTS;
D O I
10.1111/poms.12727
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In project portfolio selection, the aim is to choose projects which are expected to offer most value and satisfy relevant risk and other constraints. In this study, we show that uncertainties about how much value the projects will offer, combined with the fact that only a subset of the proposed projects will be selected, lead to inaccurate risk estimates about the aggregate value provided by the selected project portfolio. In particular, when downside risks are measured in terms of lower percentiles of the distribution of portfolio value, these risk estimates will exhibit a systematic bias. For deriving unbiased risk estimates, we present a calibration framework in which the required calibration can be presented in closed-form in some cases or, more generally, derived by using Monte Carlo simulation to study a large number of project selection decisions. We also show that when the decision must comply with risk constraints, the introduction of tighter (more demanding) risk constraints can counterintuitively aggravate the underestimation of risks. Finally, we present how the calibrated risk estimates can be employed to align the portfolio with the decision maker's risk preferences while eliminating systematic biases in risk estimates.
引用
收藏
页码:1839 / 1853
页数:15
相关论文
共 50 条
  • [1] Robust portfolio selection under downside risk measures
    Zhu, Shushang
    Li, Duan
    Wang, Shouyang
    QUANTITATIVE FINANCE, 2009, 9 (07) : 869 - 885
  • [2] Portfolio ownership, production shifts, and downside risks: Evidence from Korea
    Song, Sangcheol
    JOURNAL OF BUSINESS RESEARCH, 2023, 155
  • [3] Optimal consumption and portfolio selection problem with downside consumption constraints
    Shin, Yong Hyun
    Lim, Byung Hwa
    Choi, U. Jin
    APPLIED MATHEMATICS AND COMPUTATION, 2007, 188 (02) : 1801 - 1811
  • [4] Evaluating software project portfolio risks
    Costa, Helio R.
    Barros, Marcio de O.
    Travassos, Guilherme H.
    JOURNAL OF SYSTEMS AND SOFTWARE, 2007, 80 (01) : 16 - 31
  • [5] Portfolio Selection with Robust Estimation
    DeMiguel, Victor
    Nogales, Francisco J.
    OPERATIONS RESEARCH, 2009, 57 (03) : 560 - 577
  • [6] Taxonomy of the project portfolio risks - an empirical investigation
    Hofman, Mariusz
    Grela, Grzegorz
    CENTERIS 2017 - INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / PROJMAN 2017 - INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / HCIST 2017 - INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERI, 2017, 121 : 137 - 144
  • [7] A new uncertain random portfolio optimization model for complex systems with downside risks and diversification
    Li, Bo
    Li, Xiangfa
    Teo, Kok Lay
    Zheng, Peiyao
    CHAOS SOLITONS & FRACTALS, 2022, 160
  • [8] Portfolio Selection Methodology for a Nuclear Project
    Strang, Kenneth David
    PROJECT MANAGEMENT JOURNAL, 2011, 42 (02) : 81 - 93
  • [9] Project portfolio selection in continuous improvement
    Kornfeld, Bernard J.
    Kara, Sami
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2011, 31 (9-10) : 1071 - 1088
  • [10] Multiobjective Optimization for Project Portfolio Selection
    Barros, Marcio de O.
    Costa, Helio R.
    Figueiredo, Fabio V.
    da Rocha, Ana Regina C.
    PROCEEDINGS OF THE FOURTEENTH INTERNATIONAL CONFERENCE ON GENETIC AND EVOLUTIONARY COMPUTATION COMPANION (GECCO'12), 2012, : 1541 - 1542