An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain

被引:49
作者
Cardenas-Barron, Leopoldo Eduardo [1 ,2 ]
Teng, Jinn-Tsair [3 ]
Treviñio-Garza, Gerardo [2 ]
Wee, Hui-Ming [4 ]
Lou, Kuo-Ren [5 ,6 ]
机构
[1] Inst Tecnol & Estudios Super Monterrey, Sch Engn, Dept Ind & Syst Engn, Monterrey 64849, Nuevo Leon, Mexico
[2] Inst Tecnol & Estudios Super Monterrey, Sch Business, Dept Mkt & Int Business, Monterrey 64849, Nuevo Leon, Mexico
[3] William Paterson Univ New Jersey, Dept Mkt & Management Sci, Wayne, NJ 07470 USA
[4] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli 32023, Taiwan
[5] Dept Management Sci, Tamsui 251, Taipei, Taiwan
[6] Decis Making Tamkang Univ, Tamsui 251, Taipei, Taiwan
关键词
Production planning; Inventory control; Supply chain coordination; Joint economic lot sizing; EPQ; EOQ; SIZE;
D O I
10.1016/j.ijpe.2011.12.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Ben-Daya et al. (2010) established a joint economic lot-sizing problem (JELP) for a three-layer supply chain with one supplier, one manufacturer, and multiple retailers, and then proposed a heuristic algorithm to obtain the integral values of four discrete variables in the JELP. In this paper, we first complement some shortcomings in Ben-Daya et al. (2010), and then propose a simpler improved alternative algorithm to obtain the four integral decision variables. The proposed algorithm provides not only less CPU time but also less total cost to operate than the algorithm by Ben-Daya et al. (2010). Furthermore, our proposed algorithm can solve certain problems, which cannot be solved by theirs. Finally, the solution obtained by the proposed algorithm is indeed a global optimal solution in each of all instances tested. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:384 / 388
页数:5
相关论文
共 9 条
[1]   An integrated production inventory model with raw material replenishment considerations in a three layer supply chain [J].
Ben-Daya, Mohammed ;
As'ad, Rami ;
Seliaman, Mohammed .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :53-61
[2]   The economic production quantity (EPQ) with shortage derived algebraically [J].
Cárdenas-Barrón, LE .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 70 (03) :289-292
[3]   Optimizing inventory decisions in a multi-stage multi-customer supply chain:: A note [J].
Cardenas-Barron, Leopoldo Eduardo .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2007, 43 (05) :647-654
[4]   The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra [J].
Eduardo Cardenas-Barron, Leopoldo .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (05) :2394-2407
[5]   Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation [J].
Eduardo Cardenas-Barron, Leopoldo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 55 (04) :758-765
[6]   The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models [J].
Garcia-Laguna, Juan ;
San-Jose, Luis A. ;
Cardenas-Barron, Leopoldo E. ;
Sicilia, Joaquin .
APPLIED MATHEMATICS AND COMPUTATION, 2010, 216 (05) :1660-1672
[7]   Modelling production opportunities - An historical overview [J].
Grubbstrom, RW .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) :1-14
[8]   The EOQ with backlogging derived without derivatives [J].
Grubbström, RW ;
Erdem, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 59 (1-3) :529-530
[9]   EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus [J].
Sphicas, GP .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 100 (01) :59-64