Does clogging affect long-term removal of organics and suspended solids in gravel-based horizontal subsurface flow constructed wetlands?

被引:64
作者
Vymazal, Jan [1 ]
机构
[1] Czech Univ Life Sci Prague, Fac Environm Sci, Kamycka 129, Prague 16521 6, Czech Republic
关键词
Constructed wetlands; Clogging; Suspended solids; Treatment efficiency; Long-term performance; Organics; WASTE-WATER; ACCUMULATION; SEWAGE; SYSTEMS;
D O I
10.1016/j.cej.2017.09.048
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Constructed wetlands with horizontal subsurface flow (HF CWs) are primarily designed to remove organics and suspended solids. The major principle of this treatment process is that wastewater flows through the porous medium planted with wetland vegetation in order to achieve removal of pollutants. During the process the void spaces in the filtration material are slowly filled due to sedimentation and filtration of suspended solids, creation of biofilms on filtration material particles, chemical precipitation and growth of roots and rhizomes of the vegetation. Therefore, the clogging process is inevitable. However, the use of suitable porous filtration materials, responsible maintenance of pretreatment units and suitable loadings of organics and suspended solids may greatly slow down the clogging process. The purpose of this study was to evaluate the effect of partial ponding on treatment performance of four HF CWs that have been in operation for at least 20 years. The results revealed that if the inflow loading rates are < 10 g BOD5 m(-2) d(-1), < 20 g COD m(-2) d(-1), < 10 g TSS m(-2) d(-1), the partial ponding may occur after about 15 years of operation. The results also revealed that partial ponding have no significant effect on the quality of discharged water and the replacement of inflow zone filtration material did not results in any significant improvement either.
引用
收藏
页码:663 / 674
页数:12
相关论文
共 41 条
[1]   Evaluation of clogging in full-scale subsurface flow constructed wetlands [J].
Aiello, Rosa ;
Bagarello, Vincenzo ;
Barbagallo, Salvatore ;
Iovino, Massimo ;
Marzo, Alessia ;
Toscano, Attilio .
ECOLOGICAL ENGINEERING, 2016, 95 :505-513
[2]  
[Anonymous], 2006, DWA DTSCH VEREINIGUN
[3]  
Bavor H.J., 1989, CONSTRUCTED WETLANDS, P646
[4]  
BAVOR HJ, 1993, CONSTRUCTED WETLANDS FOR WATER QUALITY IMPROVEMENT, P219
[5]   Rootzone dynamics in constructed wetlands receiving wastewater: A comparison of vertical and horizontal flow systems [J].
Breen, PF ;
Chick, AJ .
WATER SCIENCE AND TECHNOLOGY, 1995, 32 (03) :281-290
[6]   GAS-EXCHANGE THROUGH THE SOIL ATMOSPHERE INTERPHASE AND THROUGH DEAD CULMS OF PHRAGMITES-AUSTRALIS IN A CONSTRUCTED REED BED RECEIVING DOMESTIC SEWAGE [J].
BRIX, H .
WATER RESEARCH, 1990, 24 (02) :259-266
[7]   SEWAGE-TREATMENT IN CONSTRUCTED REED BEDS - DANISH EXPERIENCES [J].
BRIX, H ;
SCHIERUP, HH .
WATER SCIENCE AND TECHNOLOGY, 1989, 21 (12) :1665-1668
[9]  
Brix H., 1990, CONSTRUCTED WETLANDS, P53, DOI DOI 10.1016/B978-0-08-040784-5.50010-3
[10]  
Brix H., 2004, MINISTRY ENV