Environmental and economic assessment of closed-loop supply chain with remanufacturing and returnable transport items

被引:105
作者
Sarkar, Biswajit [1 ]
Ullah, Mehran [1 ]
Kim, Namhun [2 ]
机构
[1] Hanyang Univ, Dept Ind & Management Engn, Ansan 15588, Gyeonggi Do, South Korea
[2] Ulsan Natl Inst Sci & Technol, Sch Mech Aerosp & Nucl Engn, Ulsan 44919, South Korea
关键词
Closed-loop supply chain; Remanufacturing; Carbon emission; Returnable transport items; Transportation; WASTE-DISPOSAL MODEL; PRODUCTION-INVENTORY MODEL; EOQ REPAIR; PRODUCTION/RECYCLING MODEL; CARBON EMISSIONS; PRODUCT QUALITY; SETUP NUMBERS; DEMAND; MANAGEMENT; RECOVERY;
D O I
10.1016/j.cie.2017.07.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Devastating environmental impacts of supply chain(s) (SC) have resulted in government legislation, customer awareness, and pressure from various stakeholders to implement environmentally sustainable strategies in SC. The most important objectives of the sustainable supply chain management (SCM) are enhancement of value creation over product life-cycle by reuse and considerations of environmental impacts. Environmental issues arising from manufacturing and logistic operations affect the economic growth as well as sustainability of the SC which must be considered during policy making. To achieve the economic goals and to improve the sustainability of SC, this paper proposes a multi-echelon closed-loop supply chain (CLSC) model with a third party logistics (3PL) that provides transportation and collection services. The proposed model investigates environmental impacts from production and transportation in a hybrid manufacturing-remanufacturing system which uses returnable transport items (RTI) for product transportation. Objectives of the model are to study the impacts of transportation and carbon emission costs in a hybrid CLSC, and to devise best RTI management policies under the influence of these costs. The developed mathematical model falls under the category of mixed-integer non-linear programming (MINLP) problems, for which an improved solution methodology has been proposed. The total cost is minimized with simultaneous optimization of container capacity, required number of containers, shipment sequence of retailers, cycle time, and remanufacturing rate. Robustness of the model is illustrated through a numerical example with five different cases, graphical representations, and sensitivity analysis. Results prove that ignoring these factors not only produce negative environmental impacts but also lead to non-optimal solutions and ultimately cause huge economic loss. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:148 / 163
页数:16
相关论文
共 60 条
[41]   Operational and environmental performance measures in a multi-product closed-loop supply chain [J].
Paksoy, Turan ;
Bektas, Tolga ;
Ozceylan, Eren .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (04) :532-546
[42]   Analysis of the EOQ repair and waste disposal problem with integer setup numbers [J].
Richter, K ;
Dobos, I .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 59 (1-3) :463-467
[43]   The extended EOQ repair and waste disposal model [J].
Richter, K .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 45 (1-3) :443-447
[44]   Pure and mixed strategies for the EOQ repair and waste disposal problem [J].
Richter K. .
Operations-Research-Spektrum, 1997, 19 (2) :123-129
[45]   The EOQ repair and waste disposal model with variable setup numbers [J].
Richter, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (02) :313-324
[46]   Preference for green packaging in consumer product choices - Do consumers care? [J].
Rokka, Joonas ;
Uusitalo, Liisa .
INTERNATIONAL JOURNAL OF CONSUMER STUDIES, 2008, 32 (05) :516-525
[47]  
Saikar B., 2015, MATH PROBL ENG, V13
[48]   Effect of variable transportation and carbon emission in a three-echelon supply chain model [J].
Sarkar, Biswajit ;
Ganguly, Baishakhi ;
Sarkar, Mitali ;
Pareek, Sarla .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 91 :112-128
[49]   A production-inventory model with probabilistic deterioration in two-echelon supply chain management [J].
Sarkar, Biswajit .
APPLIED MATHEMATICAL MODELLING, 2013, 37 (05) :3138-3151
[50]   A DTERMINISTIC INVENTORY MODEL FOR REPARABLE ITEMS [J].
SCHRADY, DA .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1967, 14 (03) :391-&