Protocol for Projecting Time-to-Corrosion of Reinforcing Steel in Concrete Exposed to Chlorides

被引:7
作者
Hartt, W. H. [1 ]
机构
[1] Florida Atlantic Univ, Dept Ocean Engn, Dania, FL USA
关键词
bridge decks; corrosion; corrosion-resistant reinforcement; critical chloride threshold concentration; marine bridge substructures; reinforced concrete; time-to-corrosion; THRESHOLD; INGRESS;
D O I
10.5006/1.3479956
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A protocol is described whereby time-to-corrosion. T(i), of reinforcing steel in concrete exposed to chlorides was calculated as a distributed, rather than discrete, parameter. The method consists of inputting (1) an average value for surface [Cl(-)] and the effective diffusion coefficient, (2) the mean and standard deviation of concrete cover over the reinforcement. and (3) a distribution function for the critical Cl(-) threshold concentration to initiate corrosion, C(T), based upon values previously reported. The calculation result is a cumulative distribution function (CDF) plot of T(i). Example analyses were performed based upon a range of design and material property values of the above parameters for both past and representative, present-day bridge decks and marine bridge substructures. Results for corrosion-resistant reinforcement are compared with those for black bar. It is proposed that reinforced concrete durability should be characterized not simply in terms of the time at which corrosion initiates for a small percentage of the reinforcement, as is normally done, but also by the rate at which active corrosion subsequently begins for the remaining. uncorroded reinforcement. Implications of such an approach are discussed.
引用
收藏
页数:10
相关论文
共 25 条
[1]  
[Anonymous], 1997, T260 AASHTO
[2]  
BAMFORTH P, 1996, CORROSION PREVENTION, V8, P91
[3]   The derivation of input data for modelling chloride ingress from eight-year UK coastal exposure trials [J].
Bamforth, PB .
MAGAZINE OF CONCRETE RESEARCH, 1999, 51 (02) :87-96
[4]  
Broomfield J.P, 1997, CORROSION STEEL CONC, P22
[5]  
CLEMENA GG, 2004, CONCR INT, V11, P39
[6]  
DARWIN D, 2007, INT LEAD ZINC UNPUB
[7]  
*FL DEP TRANSP STR, 2009, STRUCT DES GUID, V1
[8]  
*FM, 1994, 5516 FM FLOR DEP TRA
[9]  
GJORV O, 1987, CONCRETE DURABILITY, P1575
[10]  
GLASS GK, 1995, RILEM INT WORKSH CHL