Lightning study and experience on the first 500kV Transmission Line Arrester in Malaysia
被引:0
作者:
Rawi, Iryani Mohamed
论文数: 0引用数: 0
h-index: 0
机构:
Tenaga Nas Berhad, Engn Dept Transmisison, Kuala Lumpur, MalaysiaTenaga Nas Berhad, Engn Dept Transmisison, Kuala Lumpur, Malaysia
Rawi, Iryani Mohamed
[1
]
Ab Kadir, M. Z. A.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Putra Malaysia, Fac Engn, Ctr Electromagnet & Lightning Protect Res CELP, Serdang, MalaysiaTenaga Nas Berhad, Engn Dept Transmisison, Kuala Lumpur, Malaysia
Ab Kadir, M. Z. A.
[2
]
Azis, Norhafiz
论文数: 0引用数: 0
h-index: 0
机构:
Univ Putra Malaysia, Fac Engn, Ctr Electromagnet & Lightning Protect Res CELP, Serdang, MalaysiaTenaga Nas Berhad, Engn Dept Transmisison, Kuala Lumpur, Malaysia
Azis, Norhafiz
[2
]
机构:
[1] Tenaga Nas Berhad, Engn Dept Transmisison, Kuala Lumpur, Malaysia
[2] Univ Putra Malaysia, Fac Engn, Ctr Electromagnet & Lightning Protect Res CELP, Serdang, Malaysia
来源:
2014 INTERNATIONAL CONFERENCE ON LIGHTNING PROTECTION (ICLP)
|
2014年
关键词:
Transmission line performance;
insulation coordination for transmission line;
D O I:
暂无
中图分类号:
TM [电工技术];
TN [电子技术、通信技术];
学科分类号:
0808 ;
0809 ;
摘要:
Being in one of the highest region of lightning is truly a big challenge to the utilities operating transmission and distribution lines where lightning related cause of tripping has become the major concern every year. Tenaga Nasional Berhad (TNB) in Malaysia is one of those utilities facing the huge challenge in ensuring the line performance is maintained so as to conform to the National Grid requirement. In 2011, the management has addressed their major concern which was the line outages due to lightning on 500kV lines. This is an extraordinary case as commonly lightning caused tripping normally affects lower voltages with lesser insulation. Extensive studies were conducted on several selected 500kV lines and solutions were being proposed in the studies. Besides technical evaluation using software simulation and historical analysis, cost effect in applying possible solutions were also studied. This is to ensure that the best line performance will be achieved with the most cost effective solution to the company.