Time-dependent seismic hazard and risk due to wastewater injection in Oklahoma

被引:6
作者
Grigoratos, Iason [1 ]
Bazzurro, Paolo [2 ]
Rathje, Ellen [1 ]
Savvaidis, Alexandros [3 ]
机构
[1] Univ Texas Austin, 301 E Dean Keeton St, Austin, TX 78712 USA
[2] Univ Pavia, Sch Adv Studies Pavia IUSS, Pavia, Italy
[3] Univ Texas Austin, Bur Econ Geol, Austin, TX USA
关键词
Induced seismicity; economic losses; seismic risk; seismic hazard map; earthquakes; probabilistic seismic hazard analysis; earthquake damage; fluid injection; earthquake forecasting; risk mitigation; GROUND-MOTION MODEL; INDUCED EARTHQUAKES; UNCERTAINTY; MAGNITUDE; COUNTIES; INCREASE;
D O I
10.1177/8755293020988020
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the past decade, Oklahoma has experienced unprecedented seismicity rates, following an increase in the volumes of wastewater that are being disposed underground. In this article, we perform a probabilistic assessment of the time-dependent seismic hazard in Oklahoma and incorporate these results into an integrated seismic risk model to assess the evolution of the statewide economic losses, including a conservative forecast through 2030. Our risk model employs an injection-driven earthquake rate model, a region-specific ground motion model, a recent Vs30 map, HAZUS exposure data and updated vulnerability curves for both structural and nonstructural elements, and contents. The calculations are performed using a stochastic Monte Carlo-based approach implemented in the OpenQuake engine. The resulting seismic hazard maps illustrate the incompatibility of the regional seismic provisions with the current seismicity. In 2015, in particular, the induced seismic hazard in several places in Oklahoma was higher than along the San Andreas fault. During the peak of seismicity in 2015, the seismic risk was 275 times higher than the background level, with the vast majority of losses originating from damages to nonstructural elements and contents. Our direct economic loss estimates are in reasonable agreement with the paid insurance claims, but show significant sensitivity to the ground motion model selection. The proposed risk model, with possible regular updates on the seismicity rate forecast, can help stakeholders define acceptable production levels.
引用
收藏
页码:2084 / 2106
页数:23
相关论文
共 33 条
  • [21] Green investment under time-dependent subsidy retraction risk
    Hagspiel, Verena
    Nunes, Claudia
    Oliveira, Carlos
    Portela, Manuel
    JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 2021, 126
  • [22] Time-dependent seismic resilience of aging repairable structures considering multiple damage states
    Wang, Cao
    Ayyub, Bilal M.
    EARTHQUAKE ENGINEERING AND RESILIENCE, 2022, 1 (01): : 73 - 87
  • [23] Impact of time-dependent deformation on geomechanical risk for geologic carbon storage
    Bao, Ting
    Burghardt, Jeff
    Gupta, Varun
    White, Mark
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2021, 148
  • [24] Time-Dependent Framework for Analyzing Emergency Intervention Travel Times and Risk Implications due to Earthquakes. Bucharest Case Study
    Toma-Danila, D.
    Tiganescu, A.
    D'Ayala, D.
    Armas, I.
    Sun, L.
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [25] Modeling Earthquake Recurrence in the Himalayan Seismic Belt Using Time-Dependent Stochastic Models: Implications for Future Seismic Hazards
    Bajaj, Shweta
    Sharma, Mukat Lal
    PURE AND APPLIED GEOPHYSICS, 2019, 176 (12) : 5261 - 5278
  • [26] Time-dependent fire risk assessment for occupant evacuation in public assembly buildings
    Chu Guanquan
    Wang Jinhui
    Wang Qingsong
    STRUCTURAL SAFETY, 2012, 38 : 22 - 31
  • [27] Time-Dependent Monitoring of Seismic Wave Velocity Variation Associated with Three Major Seismic Events at a Deep, Narrow-Vein Mine
    Setareh Ghaychi Afrouz
    Erik Westman
    Kathryn Dehn
    Ben Weston
    Mining, Metallurgy & Exploration, 2021, 38 : 413 - 426
  • [28] Time-Dependent Monitoring of Seismic Wave Velocity Variation Associated with Three Major Seismic Events at a Deep, Narrow-Vein Mine
    Ghaychi Afrouz, Setareh
    Westman, Erik
    Dehn, Kathryn
    Weston, Ben
    MINING METALLURGY & EXPLORATION, 2021, 38 (01) : 413 - 426
  • [29] Time-dependent seismic reliability analysis of rocking cold-formed steel frame based on improved HOMM
    Yang, Xianlin
    Lu, Dagang
    Jia, Mingming
    Wang, Tao
    THIN-WALLED STRUCTURES, 2024, 200
  • [30] The coordinated bidding of a hydropower producer in three-settlement markets with time-dependent risk measure
    Vardanyan, Y.
    Hesamzadeh, M. R.
    ELECTRIC POWER SYSTEMS RESEARCH, 2017, 151 : 40 - 58