Separation of arsenic from lead smelter ash by acid leaching combined with pressure oxidation

被引:31
作者
Li, Wenhua [1 ]
Han, Junwei [1 ,2 ]
Liu, Wei [1 ,2 ]
Jiao, Fen [1 ,2 ]
Wang, Huanlong [1 ]
Qin, Wenqing [1 ,2 ]
机构
[1] Cent South Univ, Sch Minerals Proc & Bioengn, Changsha 410083, Peoples R China
[2] Cent South Univ, Key Lab Hunan Prov Clean & Efficient Utilizat Str, Changsha 410083, Peoples R China
基金
中国国家自然科学基金;
关键词
Arsenic removal; Lead smelter ash; Kinetic study; Pressure leaching; Secondary resource; WASTE-WATER; REMOVAL; COPPER; DUST; EXTRACTION; STABILIZATION; ANTIMONY; KINETICS; MODEL;
D O I
10.1016/j.seppur.2021.118988
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Smelter ash contains appreciable valuable metals and a large amount of arsenic due to its volatilization. The safe treatment of smelter ash with high arsenic is of great importance both for environmental protection and resource comprehensive utilization. In the present study, an acid leaching process combined with pressure oxidation was used to separate arsenic from lead smelter ash. In the acid leaching process, the effects of acid concentration, partial oxygen pressure, temperature, liquid-to-solid ratio, leaching time, and agitating speed were investigated, and the optimized leaching conditions were established: 100 g/L of H2SO4 concentration, 2.5 h of leaching time, 170 degrees C of temperature, 10 mL/g of liquid-to-solid ratio, 500r/min of agitating speed and 2.5 MPa of partial oxygen pressure. Under these conditions, the extractions of As, Cd, In, Zn, and Sb were 98.19%, 98.98%, 91.72%, 95.32%, and 24.23% respectively. The kinetic study reveals that the arsenic leaching process is in accordance with the diffusion-controlled type in the Avrami model, and the apparent activation energy is 2.38 kJ/mol.
引用
收藏
页数:9
相关论文
共 47 条
[1]   Selective leaching of antimony from tetrahedrite rich concentrate using alkaline sulfide solution with experimental design: Optimization and kinetic studies [J].
Aghazadeh, Sajjad ;
Abdollahi, Hadi ;
Gharabaghi, Mahdi ;
Mirmohammadi, Mirsaleh .
JOURNAL OF THE TAIWAN INSTITUTE OF CHEMICAL ENGINEERS, 2021, 119 :298-312
[2]   Arsenic removal technologies and future trends: A mini review [J].
Alka, Sadiya ;
Shahir, Shafinaz ;
Ibrahim, Norahim ;
Ndejiko, Mohammed Jibrin ;
Vo, Dai-Viet N. ;
Abd Manan, Fazilah .
JOURNAL OF CLEANER PRODUCTION, 2021, 278
[3]   Stabilization methods for the treatment of weathered arsenopyrite mine wastes: Arsenic immobilization under selective leaching conditions [J].
Alvarez-Ayuso, E. ;
Murciego, A. .
JOURNAL OF CLEANER PRODUCTION, 2021, 283
[4]   Comparison of random pore model, modified grain model, and volume reaction model predictions with experimental results of SO2 removal reaction by CuO [J].
Bahrami, R. ;
Ebrahim, H. Ale ;
Halladj, R. .
JOURNAL OF INDUSTRIAL AND ENGINEERING CHEMISTRY, 2015, 30 :372-378
[5]   Separation of arsenic from hazardous As-bearing acidic leached zinc plant purification filter cake selectively by caustic baking and water leaching [J].
Behnajady, Bahram ;
Moghaddam, Javad .
HYDROMETALLURGY, 2017, 173 :232-240
[6]   Removal of scorodite arsenic from gold ore in the form of AS2S3 and AS4S4 [J].
Boboev, I. R. ;
Tabarov, F. S. .
HYDROMETALLURGY, 2021, 199
[7]   Development and evaluation of an early removal process for the beneficiation of arsenic-bearing copper ores [J].
Bruckard, W. J. ;
Davey, K. J. ;
Jorgensen, F. R. A. ;
Wright, S. ;
Brew, D. R. M. ;
Hague, N. ;
Vance, E. R. .
MINERALS ENGINEERING, 2010, 23 (15) :1167-1173
[8]   Hydrometallurgical Leaching of Copper Flash Furnace Electrostatic Precipitator Dust for the Separation of Copper from Bismuth and Arsenic [J].
Caplan, Michael ;
Trouba, Joseph ;
Anderson, Corby ;
Wang, Shijie .
METALS, 2021, 11 (02) :1-18
[9]   Two-step leaching process and kinetics for an eco-friendly recycling of critical metals from spent Li-ion batteries [J].
Chabhadiya, Karan ;
Srivastava, Rajiv Ranjan ;
Pathak, Pankaj .
JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2021, 9 (03)
[10]   A cleaning process for the removal and stabilisation of arsenic from arsenic-rich lead anode slime [J].
Chen, Yongming ;
Liu, Nannan ;
Ye, Longgang ;
Xiong, Shan ;
Yang, Shenghai .
JOURNAL OF CLEANER PRODUCTION, 2018, 176 :26-35