Minimizing makespan on an m-machine re-entrant flowshop

被引:35
|
作者
Choi, Seong-Woo [1 ]
Kim, Yeong-Dae [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
关键词
scheduling; flowshop; re-entrant; heuristics;
D O I
10.1016/j.cor.2006.09.028
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper focuses on an m-machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, routes of all jobs are identical as in ordinary flowshops, but the jobs must be processed multiple times on the machines. We present heuristic algorithms, which are modified from well-known existing algorithms for the general m-machine flowshop, problem or newly developed in this research. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems and results are reported. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1684 / 1696
页数:13
相关论文
共 50 条
  • [41] Heuristic algorithms for two machine re-entrant flow shop
    Jing, Caixia
    Tang, Guochun
    Qian, Xingsan
    THEORETICAL COMPUTER SCIENCE, 2008, 400 (1-3) : 137 - 143
  • [42] Minimizing total completion time for re-entrant flow shop scheduling problems
    Jing, Caixia
    Huang, Wanzhen
    Tang, Guochun
    THEORETICAL COMPUTER SCIENCE, 2011, 412 (48) : 6712 - 6719
  • [43] SHAPE CLASSIFICATION OF RE-ENTRANT PARTICLES .2. DESCRIPTION OF RE-ENTRANT AND NON-RE-ENTRANT PARTICLE SHAPES
    STANIFORTH, JN
    REES, JE
    POWDER TECHNOLOGY, 1981, 28 (01) : 9 - 16
  • [44] Minimizing makespan with multiple-orders-per-job in a two-machine flowshop
    Laub, Jeffrey D.
    Fowler, John W.
    Keha, Ahmet B.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (01) : 63 - 79
  • [45] MINIMIZING THE MAKESPAN IN THE 3-MACHINE ASSEMBLY-TYPE FLOWSHOP SCHEDULING PROBLEM
    LEE, CY
    CHENG, TCE
    LIN, BMT
    MANAGEMENT SCIENCE, 1993, 39 (05) : 616 - 625
  • [46] Minimizing total flow time in a two-machine flowshop problem with minimum makespan
    Gupta, JND
    Neppalli, VR
    Werner, F
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 69 (03) : 323 - 338
  • [47] Some single-machine and m-machine flowshop scheduling problems with learning considerations
    Lee, Wen-Chiung
    Wu, Chin-Chia
    INFORMATION SCIENCES, 2009, 179 (22) : 3885 - 3892
  • [48] MINIMIZING THE MAKESPAN IN A 2-MACHINE FLOWSHOP WITH TIME LAGS AND SETUP CONDITIONS.
    Khurana, Kanta
    Bagga, P.C.
    ZOR. Zeitschrift fur Operations-Research, 1984, 28 (05): : 163 - 174
  • [49] Re-entrant DNA gels
    Bomboi, Francesca
    Romano, Flavio
    Leo, Manuela
    Fernandez-Castanon, Javier
    Cerbino, Roberto
    Bellini, Tommaso
    Bordi, Federico
    Filetici, Patrizia
    Sciortino, Francesco
    NATURE COMMUNICATIONS, 2016, 7
  • [50] A re-entrant Colho phase
    Fimmen, W.
    Gluesen, B.
    Kettner, A.
    Wittenberg, M.
    Liquid Crystals, 23 (04):