Minimizing makespan on an m-machine re-entrant flowshop

被引:36
作者
Choi, Seong-Woo [1 ]
Kim, Yeong-Dae [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
关键词
scheduling; flowshop; re-entrant; heuristics;
D O I
10.1016/j.cor.2006.09.028
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper focuses on an m-machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, routes of all jobs are identical as in ordinary flowshops, but the jobs must be processed multiple times on the machines. We present heuristic algorithms, which are modified from well-known existing algorithms for the general m-machine flowshop, problem or newly developed in this research. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems and results are reported. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1684 / 1696
页数:13
相关论文
共 20 条
[1]   A survey of very large-scale neighborhood search techniques [J].
Ahuja, RK ;
Ergun, Ö ;
Orlin, JB ;
Punnen, AP .
DISCRETE APPLIED MATHEMATICS, 2002, 123 (1-3) :75-102
[2]   Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop [J].
Choi, SW ;
Kim, YD ;
Lee, GC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (11) :2149-2167
[3]  
CHOI SW, 2007, IN PRESS J OPERATION
[4]  
Demirkol E., 2000, J SCHEDULING, V3, P115
[5]   A SIMULATED ANNEALING HEURISTIC FOR SCHEDULING IN A FLOWSHOP WITH BICRITERIA [J].
GANGADHARAN, R ;
RAJENDRAN, C .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) :473-476
[6]   A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion [J].
Grabowski, J ;
Wodecki, M .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (11) :1891-1909
[7]  
GRAVES SC, 1983, J OPERATIONS MANAGEM, V3, P197, DOI DOI 10.1016/0272-6963(83)90004-9
[8]  
ISHUBUCHI M, 1995, EUR J OPER RES, V81, P388
[9]   OPTIMIZATION BY SIMULATED ANNEALING - AN EXPERIMENTAL EVALUATION .1. GRAPH PARTITIONING [J].
JOHNSON, DS ;
ARAGON, CR ;
MCGEOCH, LA ;
SCHEVON, C .
OPERATIONS RESEARCH, 1989, 37 (06) :865-892
[10]   Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process [J].
Kim, YD ;
Lim, HG ;
Park, MW .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (01) :124-143