Measurement & Verification of Coal Fired Power Station Maintenance Projects

被引:0
作者
de Canha, D. [1 ]
Pretorius, J. H. C. [1 ]
机构
[1] Univ Johannesburg, Fac Engn & Built Environm, Johannesburg, South Africa
来源
2015 AUSTRALASIAN UNIVERSITIES POWER ENGINEERING CONFERENCE (AUPEC) | 2015年
关键词
Measurement and Verification; coal fired power station; energy efficiency; steam feed pump; turbine re-blade;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A South African electricity utility implemented numerous power station improvement projects aimed at either increasing efficiency or output megawatts. This paper presents an overview of the process used to measure and verify (M&V) the energy and demand impacts of two projects at one of the power stations. The projects were a steam feed pump refurbishment and a high pressure turbine re-blade. The projects were M&V'd using the International Performance Measurement & Verification Protocol (IPMVP). This involves establishing a baseline model for the performance of the two units affected by the project. The post implementation performance of each unit is then compared to its baseline, after making adjustments for changes in operating conditions between the baseline and assessment periods. Both projects resulted in an increase in megawatts sent out. Additionally the turbine re-blade resulted in a 2.7% increase in efficiency.
引用
收藏
页数:5
相关论文
共 8 条
[1]  
[Anonymous], 2010, 50010 SABS
[2]  
[Anonymous], 2014, MEAS VER PROC CALC R
[3]  
[Anonymous], 2014, EN PERF MEAS VER GUI
[4]  
[Anonymous], POW GEN COAL MEAS RE
[5]  
Efficiency Valuation Organization, 2012, INT PERF MEAS VER PR, V1, DOI [10.2172/15000242, DOI 10.2172/15000242]
[6]  
The Australian Energy Performance Contracting Association, 2004, BEST PRACT GUID MEAS
[7]   Mathematical description for the measurement and verification of energy efficiency improvement [J].
Xia, Xiaohua ;
Zhang, Jiangfeng .
APPLIED ENERGY, 2013, 111 :247-256
[8]  
Ye X., 2013, 2013 INT EN PROGR EV