Project cost control: a new method to plan and control costs in large projects

被引:11
|
作者
Jayaraman, R. [1 ]
机构
[1] SP Jain Inst Management & Res, Dept Operat Management, Bombay, Maharashtra, India
关键词
Project management; Collaboration; Coordination; Project teams; Contracts; Project managers; Business process re-engineering; Project cost control; Project contingency; Package contingency; Project cost control system;
D O I
10.1108/BPMJ-10-2014-0102
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose - The purpose of this paper is to reengineer the process of cost management in large projects. Design/methodology/approach - Considering the fact most large projects overrun their budgets because of the long time period needed to completion, it was decided to reengineer the cost management. Accordingly costs allocated to packages were reviewed and changed on a dynamic basis. Different types of contingencies were provided. Concepts of package contingency and project contingency were introduced. These were based on the project buffer and feeding buffer concepts popularised by Eliyahu Goldratt. Findings - The re-engineered method of cost control worked well and yielded better than expected results, leading to the setting up of a new world record in the completion time for setting up a million tonnes per annum continuous, tandem cold rolling mill to roll steel sheets. Research limitations/implications - In view of the total success of the reengineered approach, which was tested out on a large project over three years, it is felt that other projects could also try out this technique, especially since it is along the lines proposed by Eliyahu Goldratt who is an authority on project management. However the success can be better understood if the results of the testing become available. To that extent the contents of the present paper have limitations. Practical implications - Large projects can deploy the methodology and complete their projects on time and under budget. Social implications - The reengineering of the cost management was done primarily with a view to complete projects under budget. Since many governments spend many billions of dollars on publicly funded projects for the welfare of citizens, the use of this technique could have a salutary effect on the cost. Originality/value - The method was innovated in the company by the author's team and deployed in a live project over four years for the first time to achieve world-class results.
引用
收藏
页码:1247 / 1268
页数:22
相关论文
共 50 条
  • [1] Guideline for project cost control for large-scale projects using probabilistic methods
    Gschoesser, F.
    Sander, P.
    Lintner, P.
    Tautschnig, A.
    Entacher, M.
    BAUINGENIEUR, 2018, 93 : 355 - 364
  • [2] Cost Control in Mega Projects Using the Delphi Method
    Gharaibeh, Hani M.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (05)
  • [3] Cost Budget and Cost Control Analysis of New Green Building Projects
    Wan, Keshu
    2018 5TH INTERNATIONAL CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BUSEM 2018), 2018, : 532 - 537
  • [4] THE INTEGRATION OF PROJECT TIME CONTROL AND PROJECT COST CONTROL
    COWELL, FB
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS, 1982, 196 (DEC): : 313 - 316
  • [5] COST CONTROL OF CAPITAL PROJECTS
    SINCLAIR, JM
    AACE BULLETIN, 1970, 12 (06): : 154 - &
  • [6] The Quantification and Control of Project Costs
    Chen Daozheng
    Tang Xiaogang
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 829 - 833
  • [7] SOME ASPECTS OF COST CONTROL IN LARGE R & D PROJECTS.
    Jain, V.K.
    1600, (23):
  • [8] Research on Materials for Construction Projects Cost Control -Taking a Project in Shijiazhuang as an Example
    Yu, Xiangmei
    Geng, Dongyang
    Xie, Zhenbin
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1846 - +
  • [9] THE MICROCOMPUTER - READY TO HELP PLAN AND CONTROL PROJECTS
    ABBOTT, KW
    HIGHWAY & HEAVY CONSTRUCTION, 1984, 127 (10): : 52 - 54
  • [10] PROJECT VISIABILITY AND CONTROL BY VIS A PLAN
    RANCK, NH
    JOURNAL OF INDUSTRIAL ENGINEERING, 1967, 18 (11): : R25 - &