Linear programming as a tool to design the mix of cement plant raw materials

被引:1
作者
Hassan, Mohamed M. [1 ]
Bader, Salah A. [2 ]
Ali, Mahrous A. [1 ]
Abdellah, Wael R. [3 ]
Abdelhaffez, Gamal S. [3 ,4 ]
机构
[1] Al Azhar Univ, Fac Engn Qena, Min & Petr Engn Dept, Qena 83513, Egypt
[2] Al Azhar Univ, Fac Engn Cairo, Min & Petr Engn Dept, Cairo, Egypt
[3] Assiut Univ, Dept Min & Met Engn, Fac Engn, Assiut 71515, Egypt
[4] King Abdulaziz Univ, Fac Engn, Dept Min Engn, Jeddah, Saudi Arabia
来源
RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK | 2022年 / 37卷 / 04期
关键词
raw mix; cement industry; linear programming; blending operations; SUPPLY CHAIN; TRANSPORTATION; OPTIMIZATION; PRINCIPLES; OPERATIONS; SEARCH;
D O I
10.17794/rgn.2022.4.9
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
This study uses linear programming to develop a methodology for selecting the best raw material mix in an ASCOM cement plant in Egypt. In cement factories, this type adheres to Egyptian chemical composition criteria for raw feed (e.g. 82.5% calcium carbonate, 14.08% silica, 2.5% alumina and 0.92% iron oxide). Furthermore, the model is bound by industry-specific characteristics (e.g. lime saturation factor, silica modulus, alumina modulus and loss of ignition). The results reveal that the model is able to accurately reproduce the mixing of high-quality feed with varying constituent percentages. It is also capable of determining the combining limitations of each ingredient. Furthermore, it demonstrates optimality for additive sourcing short-term planning and capping limestone quality to meet changeable component combinations. Additionally, improving the raw mix reduces limestone feed quality from 51 to 50.6%, resulting in the inclusion of extra limestone reserves.
引用
收藏
页码:109 / 117
页数:9
相关论文
共 46 条
[1]   OPTIMIZATION OF BLENDING OPERATION FOR ASWAN PHOSPHATE MINES USING LINEAR PROGRAMMING [J].
Ali, Mahrous A. M. ;
Wasly, H. S. ;
Abdellah, W. R. ;
Jang, Hyongdoo .
MINING OF MINERAL DEPOSITS, 2018, 12 (04) :1-8
[2]   Transportation problem: A special case for linear programing problems in mining engineering [J].
Ali Mahrous, A. M. ;
Hyung, Sik Yang .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2012, 22 (03) :371-377
[3]  
Ambrisko L, 2015, ACTA MONTAN SLOVACA, V20, P141
[4]   Implementing a blending optimization model for short-range production planning of cement quarry operation [J].
Asad, M. W. A. .
JOURNAL OF MINING SCIENCE, 2010, 46 (05) :525-535
[5]   Manufacture of Portland cement from Late Miocene claystone, Injana formation, Central Iraq [J].
Awadh, Salih Muhammad ;
Awad, Ali Mutlag .
ARABIAN JOURNAL OF GEOSCIENCES, 2020, 13 (19)
[6]  
Azzamouri A., 2018, P 7 INT C INF SYST L, P634
[7]  
Babazadeh R, 2019, INT J OPTIMIZATION C, V9, P561
[8]  
Bamoumen M., 2018, P 7 INT C INFORM SYS, P1
[9]   Robust planning of blending activities at refineries [J].
Bengtsson, J. ;
Bredstrom, D. ;
Flisberg, P. ;
Ronnqvist, M. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (06) :848-863
[10]  
Duda W., 1983, CEMENT DATA BOOK INT