Hierarchical multi-agent predictive maintenance scheduling for trains using price-based approach

被引:7
|
作者
Rokhforoz, Pegah [1 ,2 ]
Fink, Olga [1 ]
机构
[1] Swiss Fed Inst Technol, Chair Intelligent Maintenance Syst, Zurich, Switzerland
[2] Univ Tehran, Sch Elect & Comp Engn, Tehran, Iran
基金
瑞士国家科学基金会;
关键词
Railway wagon maintenance scheduling; Train scheduling; Multi-agent system; Hierarchical algorithm; OPTIMIZATION;
D O I
10.1016/j.cie.2021.107475
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
While the progress of predictive maintenance has been rising in various application fields and several feasibility studies and prototypes have been developed, the operational implementation of predictive maintenance requires a more flexible and adaptive scheduling of the predicted maintenance interventions. Contrary to the traditional preventive maintenance tasks that are typically known long in advance, predictive maintenance may require very short-term schedule changes which are also affecting the operation. Railway rolling stock has some special requirements in terms of time table adherence and vehicle scheduling and routing that make the operational implementation of predictive maintenance particularly challenging. In this paper, we propose a hierarchical multi-agent framework for the predictive maintenance scheduling of passenger railway wagons. Besides fulfilling the requirement of scheduling the maintenance of a wagon before it fails (and potentially causes delays), also the passenger demand must be satisfied and the trains must be accordingly assigned to different routes following the time table. We propose a hierarchical distributed learning algorithm using dual decomposition and mechanism design approach. The proposed framework enables to preserve local preferences and particularities and to avoid high computational cost. In the proposed method, first, we decompose the centralized problem using the dual decomposition method, and handle the passenger demand fulfillment constraints by Lagrange multiplier ("shadow price"). Furthermore, the wagons with the private information on the system health need to perform the maintenance before their failure time (with a predicted remaining useful lifetime (RUL) and the corresponding uncertainty). To achieve this aim, we propose a mechanism design approach to align the wagons' objective function to the aim of the central system using an incentive signal. The incentive signal creates a noncooperative game among the wagons. We prove that the Nash Equilibrium (NE) of this game is the optimal solution of the predictive maintenance scheduling. The effectiveness of the proposed method is demonstrated on a case study of a small railway network.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Bus maintenance scheduling using multi-agent systems
    Zhou, R
    Fox, B
    Lee, HP
    Nee, AYC
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2004, 17 (06) : 623 - 630
  • [2] A multi-agent based framework for maintenance resource scheduling decision
    Cui, Bowen
    Wang, Zili
    Feng, Qiang
    Ren, Yi
    Sun, Bo
    Yang, Dezhen
    2018 INTERNATIONAL CONFERENCE ON SENSING, DIAGNOSTICS, PROGNOSTICS, AND CONTROL (SDPC), 2018, : 527 - 530
  • [3] A multi-agent system for distributed maintenance scheduling
    Hedjazi, Djalal
    Layachi, Fateh
    Boubiche, Djallel Eddine
    COMPUTERS & ELECTRICAL ENGINEERING, 2019, 77 : 1 - 11
  • [4] Approach to the distributed jobshop scheduling based on multi-Agent
    Liu Hong-wei
    Wang Yan-hong
    PROCEEDINGS OF THE 2007 CHINESE CONTROL AND DECISION CONFERENCE, 2007, : 495 - 498
  • [5] Approach to the Distributed Job Shop Scheduling Based on Multi-agent
    Zhang Yu-xian
    Li Lei
    Wang Hong
    Zhao Yan-yan
    Guo Xu
    Meng Chun-hua
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2031 - 2034
  • [6] Enhancing the effectiveness of joint production and maintenance scheduling based on a multi-agent system and a Pigouvian approach of externalities
    Kedy, Ghislain Serge Mepouly
    Penda, Malcom Chumchoua
    Nneme, Leandre Nneme
    Mayi, Olivier Thierry Sosso
    Lehman, Leopold Gustave
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2024, 18 (05): : 837 - 852
  • [7] A Multi-Agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem
    Khelifati, Si Larabi
    Benbouzid-Sitayeb, Fatima
    COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT II: THIRD INTERNATIONAL CONFERENCE, ICCCI 2011, 2011, 6923 : 60 - 69
  • [8] Multi-agent based Integration of Process Planning and Scheduling
    Li, Xinyu
    Li, Weidong
    Gao, Liang
    Zhang, Chaoyong
    Shao, Xinyu
    2009 13TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, 2009, : 215 - +
  • [9] Multi-agent deep reinforcement learning based Predictive Maintenance on parallel machines
    Rodriguez, Marcelo Luis Ruiz
    Kubler, Sylvain
    de Giorgio, Andrea
    Cordy, Maxime
    Robert, Jeremy
    Le Traon, Yves
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2022, 78
  • [10] Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance
    Kaplanoglu, Vahit
    APPLIED SOFT COMPUTING, 2014, 23 : 165 - 179