A generalized Petri net modeling approach for the control of re-entrant flow semiconductor wafer fabrication

被引:29
作者
Odrey, NG [1 ]
Green, JD [1 ]
Appello, A [1 ]
机构
[1] Lehigh Univ, Dept Ind & Mfg Syst Engn, Bethlehem, PA 18015 USA
关键词
Petri net modeling; re-entrant flow shops; scheduling; semiconductor manufacturing; work release policies;
D O I
10.1016/S0736-5845(00)00031-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Re-entrant flow manufacturing lines, such as occur in semiconductor wafer fabrication, are characterized by a product routing that consists of multiple visits to a workstation or group of workstations during the manufacturing process. In this paper, a modeling approach is based on the use of generalized Petri nets for a re-entrant flow manufacturing line is presented. Specifically, three Petri net models representing a re-entrant flow line with three work centers and six machines are modeled. How these models may be used to represent a variety of queuing disciplines and work release policies is discussed. (C) 2001 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:5 / 11
页数:7
相关论文
共 17 条
  • [1] PERFORMANCE ANALYSIS TECHNIQUES FOR IC MANUFACTURING LINES
    BURMAN, DY
    GURROLAGAL, FJ
    NOZARI, A
    SATHAYE, S
    SITARIK, JP
    [J]. AT&T TECHNICAL JOURNAL, 1986, 65 (04): : 46 - 57
  • [2] Improving Flexible Semiconductor Manufacturing System performance by a coloured Petri net-based scheduling algorithm
    Cavalieri, S
    Mirabella, O
    Marroccia, S
    [J]. ETFA '97 - 1997 IEEE 6TH INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION PROCEEDINGS, 1997, : 369 - 374
  • [3] EMPIRICAL-EVALUATION OF A QUEUING NETWORK MODEL FOR SEMICONDUCTOR WAFER FABRICATION
    CHEN, H
    HARRISON, JM
    MANDELBAUM, A
    VANACKERE, A
    WEIN, LM
    [J]. OPERATIONS RESEARCH, 1988, 36 (02) : 202 - 215
  • [4] The QNET method for re-entrant queueing networks with priority disciplines
    Dai, JG
    Yeh, DH
    Zhou, C
    [J]. OPERATIONS RESEARCH, 1997, 45 (04) : 610 - 623
  • [5] Desrochers A. A., 1995, APPL PETRI NETS MANU
  • [6] HARRIS JB, 1990, J EDUC COMPUT RES, V6, P1, DOI 10.2190/NRWX-1MD8-A107-R4W1
  • [7] Kim J, 1997, IEEE SYS MAN CYBERN, P3227, DOI 10.1109/ICSMC.1997.633103
  • [8] Kumar P. R., 1993, Queueing Systems Theory and Applications, V13, P87, DOI 10.1007/BF01158930
  • [9] EFFICIENT SCHEDULING POLICIES TO REDUCE MEAN AND VARIANCE OF CYCLE-TIME IN SEMICONDUCTOR MANUFACTURING PLANTS
    LU, SCH
    RAMASWAMY, D
    KUMAR, PR
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1994, 7 (03) : 374 - 388
  • [10] DISTRIBUTED SCHEDULING BASED ON DUE DATES AND BUFFER PRIORITIES
    LU, SH
    KUMAR, PR
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1991, 36 (12) : 1406 - 1416