Analyzing the Trade-Offs between Meeting Biorefinery Production Capacity and Feedstock Supply Cost: A Chance Constrained Approach

被引:1
作者
Lambert, Lixia H. [1 ]
DeVuyst, Eric A. [1 ]
English, Burton C. [2 ]
Holcomb, Rodney [1 ,3 ]
机构
[1] Oklahoma State Univ, Dept Agr Econ, Stillwater, OK 74078 USA
[2] Univ Tennessee, Dept Agr & Resource Econ, Knoxville, TN 37996 USA
[3] Oklahoma State Univ, Food & Ag Prod Ctr, Stillwater, OK 74078 USA
基金
美国食品与农业研究所;
关键词
biofuel; switchgrass (Panicum virgatum L; uncertainty; risk; chance constrained programming; OPTIMAL POWER-FLOW; CELLULOSIC ETHANOL; LONG-TERM; SWITCHGRASS; BIOFUEL; MANAGEMENT; BIOMASS; OPTIMIZATION; CHAIN; BIOENERGY;
D O I
10.3390/en14164763
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Commercial-scale switchgrass production for cellulosic biofuel remains absent in U.S. A well-recognized difficulty is the steady provision of high-quality feedstock to biorefineries. Switchgrass yield is random due to weather and growing conditions, with low yields during establishment years. Meeting biorefinery production capacity requirements 100% of the time or at any other frequency requires contracting sufficient amount of agricultural land areas to produce feedstock. Using chance-constrained programming, the trade-offs between the degree of certainty that refinery demand for feedstock and the cost of contracting production acreage is assessed. Varying the certainty from 60% to 95%, we find the costs of production, logistics and transportation ranged from 27% to 96% of the cost of 100% certainty. Investors and managers need to consider the cost of certainty of biomass acquisition when contracting for production acreage.
引用
收藏
页数:13
相关论文
共 65 条
  • [1] Long-term studies on switchgrass grown on a marginal area in Greece under different varieties and nitrogen fertilization rates
    Alexopoulou, Efthymia
    Zanetti, Federica
    Papazoglou, Eleni G.
    Christou, Myrsini
    Papatheohari, Yolanda
    Tsiotas, Kostas
    Papamichael, I.
    [J]. INDUSTRIAL CROPS AND PRODUCTS, 2017, 107 : 446 - 452
  • [2] Chance-Constrained AC Optimal Power Flow for Distribution Systems With Renewables
    Anese, Emiliano Dall'
    Baker, Kyri
    Summers, Tyler
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (05) : 3427 - 3438
  • [3] [Anonymous], 1989, EC DRYLAND MANAGEMEN
  • [4] [Anonymous], 2008, P INT AGR EN SYST C
  • [5] [Anonymous], 2019, FARMLAND INFORM CTR
  • [6] CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING AND OPTIMIZATION OF WATER-RESOURCE SYSTEMS
    ASKEW, AJ
    [J]. WATER RESOURCES RESEARCH, 1974, 10 (06) : 1099 - 1106
  • [7] On meeting capital requirements with a chance-constrained optimization model
    Atta Mills, Ebenezer Fiifi Emire
    Yu, Bo
    Gu, Lanlan
    [J]. SPRINGERPLUS, 2016, 5
  • [8] Uncertainties and sustainability concepts in biofuel supply chain management: A review
    Awudu, Iddrisu
    Zhang, Jun
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2012, 16 (02) : 1359 - 1368
  • [9] Adoption of switchgrass cultivation for biofuel under uncertainty: A discrete-time modeling approach
    Burli, Pralhad
    Forgoston, Eric
    Lal, Pankaj
    Billings, Lora
    Wolde, Bernabas
    [J]. BIOMASS & BIOENERGY, 2017, 105 : 107 - 115
  • [10] Community-scale renewable energy systems planning under uncertainty-An interval chance-constrained programming approach
    Cai, Y. P.
    Huang, G. H.
    Yang, Z. F.
    Lin, Q. G.
    Tan, Q.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2009, 13 (04) : 721 - 735