Decomposition techniques for a loosely-coupled resource allocation problem

被引:0
作者
Plamondon, P [1 ]
Chaib-Draa, B [1 ]
Benaskeur, AR [1 ]
机构
[1] Univ Laval, Comp Sci & Software Engn Dept, Ste Foy, PQ G1K 7P4, Canada
来源
2005 IEEE/WIC/ACM INTERNATIONAL CONFERENCE ON INTELLIGENT AGENT TECHNOLOGY, PROCEEDINGS | 2005年
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We are interested by contributing to stochastic problems of which the main distinction is that some tasks may create other tasks. In particular we present a first approach which represent the problem by an acyclic graph, and solves each node in a certain order so as to produce an optimal solution. Then, we detail a second algorithm, which solves each task separately, using the first approach, and where an on-line heuristic computes the global actions to execute when the state of a task changes.
引用
收藏
页码:595 / 598
页数:4
相关论文
共 9 条
[1]  
[Anonymous], 1957, Dynamic Programming
[2]  
Dolgov DmitriA., 2004, Proceedings of the Fourteenth International Conference on Automated Planning and Scheduling (ICAPS), P315
[3]   LAO*: A heuristic search algorithm that finds solutions with loops [J].
Hansen, EA ;
Zilberstein, S .
ARTIFICIAL INTELLIGENCE, 2001, 129 (1-2) :35-62
[4]  
Howard Ronald A., 1960, DYNAMIC PROGRAMMING
[5]  
Meuleau N, 1998, FIFTEENTH NATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE (AAAI-98) AND TENTH CONFERENCE ON INNOVATIVE APPLICATIONS OF ARTIFICAL INTELLIGENCE (IAAI-98) - PROCEEDINGS, P165
[6]  
Nilsson N., 1980, Principles of Artificial intelligente
[7]  
Tarjan R., 1971, Conference record 1971 12th annual symposium on switching and automata theory, P114, DOI 10.1137/0201010
[8]  
WU CC, 2004, AFRLVAWPTP2004311
[9]  
ZHANG W, 2002, WUCS200213 WASH U