Study on Job Shop Scheduling Optimization with Multi-objective

被引:0
作者
Ze, Tao [1 ]
Di, Liang [2 ]
Qun, Zhou [3 ]
机构
[1] Shenyang Ligong Univ, Sch Mech Engn, Shenyang 110168, Peoples R China
[2] Shenyang Univ, Sch Mech Engn, Shenyang 110044, Peoples R China
[3] AVIC Shenyang Aircraft Corp, Shenyang 110850, Peoples R China
来源
HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2 | 2011年 / 217-218卷
关键词
job shop scheduling; multi-objective optimization; genetic algorithm; Pareto optimum;
D O I
10.4028/www.scientific.net/AMR.217-218.326
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
A new multi-objective scheduling method based on the GA is proposed to the job-shop scheduling problem (JSP) constrained by machines, workers. Function objectives of the proposed method are to minimize the completion time, the maximum load of machines and the total expense of machines and workers. Firstly, the mathematical model is constructed. Then, on the basis of the mathematical model, the genetic algorithm (GA) based on Pareto is applied, and an optimal or suboptimal scheduling plan can be obtained. The optimal solutions are not unique due to the multi-objective of JSP. Finally, a scheduling example is employed to illustrate that the proposed method could solve multi-objective job shop scheduling problem effectively.
引用
收藏
页码:326 / +
页数:2
相关论文
共 7 条
[1]  
CUI XX, 2006, MULTIOBJECTIVE EVOLU
[2]   SOLVING A MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH TIMED PETRI NETS AND GENETIC ALGORITHM [J].
Huang, Hejiao ;
Lu, Taiping .
DISCRETE MATHEMATICS ALGORITHMS AND APPLICATIONS, 2010, 2 (02) :221-237
[3]   A hybrid genetic algorithm for the job shop scheduling problems [J].
Park, BJ ;
Choi, HR ;
Kim, HS .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (04) :597-613
[4]   A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS [J].
Reddy, B. S. P. ;
Rao, C. S. P. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (5-6) :602-613
[5]  
Wei Wei, 2009, Computer Integrated Manufacturing Systems, V15, P1592
[6]   An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems [J].
Xia, WJ ;
Wu, ZM .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) :409-425
[7]  
Yuan Kun, 2007, China Mechanical Engineering, V18, P156