The Application of Fuzzy Comprehensive Evaluation Based on AHP in Risk Evaluation of Engineering Project

被引:0
作者
Wang Chengjun [1 ]
Zuo Xinhui [1 ]
机构
[1] Xian Univ Architecture & Technol, Sch Management, Xian 710055, Peoples R China
来源
ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2 | 2010年
关键词
AHP; Fuzzy Comprehensive Evaluation; Project Risk;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The risk analysis and evaluation is the key link in the process of project risk management. Its results directly effect on the decision-making of project risk. The fuzzy comprehensive evaluation based on AHP is used in the risk evaluation of engineering project in this paper, and these methods are proved to be scientific and effective through an example.
引用
收藏
页码:108 / 112
页数:5
相关论文
共 5 条
[1]  
Bogardi I, 2003, RISK-BASED DECISIONMAKING IN WATER RESOURCES X, P12
[2]  
Chen Shuili, 2006, FUZZY SET THEOR APPL, P189
[3]  
Wideman R.Max., 1992, PROJECT PROGRAM RISK
[4]  
Xie Jijian, 2005, FUZZY MATH METHOD AP, V5, P205
[5]  
Zhao Huanchen, 1986, AHP SIMPLE CONVENIEN, V9, P1