Balancing, sequencing, and job rotation scheduling of a U-shaped lean cell with dynamic operator performance

被引:27
作者
Ayough, Ashkan [1 ]
Zandieh, Mostafa [1 ]
Farhadi, Farbod [2 ]
机构
[1] Shahid Beheshti Univ, Management & Accounting Fac, Dept Ind Management, Tehran, Iran
[2] Roger Williams Univ, Bristol, RI 02809 USA
关键词
U-shaped lean cell; Balancing and sequencing; Rotation scheduling; Human factor; Non-linear integer programming; Variable neighborhood search; MATHEMATICAL-MODEL; ALLOCATION; ALGORITHM; TIME;
D O I
10.1016/j.cie.2020.106363
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Performance of a manufacturing cell is dependent on an efficient layout design, and optimal work schedules. However, the operator-dependent factors such as learning, forgetting, motivation, and boredom, can considerably impact the output of the system. In this study, we consider heterogeneous operators with dynamic performance metrics and integrate the job assignment, and job rotation scheduling problems, with the balancing and production sequencing in a U-shaped lean manufacturing cell. We present a novel multi-period nonlinear mixed-integer model to minimize the deviations from takt time, and the number of operators, in a finite planning horizon. An efficient meta-heuristic approach is developed to solve the problem and the results are compared to a static case where no human factor is included. Our computational results demonstrate that including the operator-dependent metrics can improve the performance of the cell design. We conduct a sensitivity analysis of the scheduling parameters including, rotation frequencies, takt time, cell size, and task types, and derive that the obtained solutions with the static settings, are not sufficient for an efficient lean cell design in the presence of dynamic human factors.
引用
收藏
页数:17
相关论文
共 38 条
[1]   Investigating the effects of learning and forgetting on the feasibility of adopting additive manufacturing in supply chains [J].
Afshari, Hamid ;
Jaber, Mohamad Y. ;
Searcy, Cory .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 128 :576-590
[2]   Balancing stochastic U-lines using particle swarm optimization [J].
Aydogan, Emel Kizilkaya ;
Delice, Yilmaz ;
Ozcan, Ugur ;
Gencer, Cevriye ;
Bali, Ozkan .
JOURNAL OF INTELLIGENT MANUFACTURING, 2019, 30 (01) :97-111
[3]   GA and ICA approaches to job rotation scheduling problem: considering employee's boredom [J].
Ayough, Ashkan ;
Zandieh, M. ;
Farsijani, H. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8) :651-666
[4]   Modeling job rotation in manufacturing systems: The study of employee's boredom and skill variations [J].
Azizi, Nader ;
Zolfaghari, Saeed ;
Liang, Ming .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 123 (01) :69-85
[5]   A novel meta-heuristic approach to solve fuzzy multi-objective straight and U-shaped assembly line balancing problems [J].
Babazadeh, Hossein ;
Javadian, Nikbakhsh .
SOFT COMPUTING, 2019, 23 (17) :8217-8245
[6]   Pricing and inventory decisions in a dual-channel supply chain with learning and forgetting [J].
Batarfi, Raaid ;
Jaber, Mohamad Y. ;
Glock, Christoph H. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 :397-420
[7]   Batching decisions in multi-item production systems with learning effect [J].
Castellano, Davide ;
Gallo, Mose ;
Grassi, Andrea ;
Santillo, Liberatina C. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 :578-591
[8]   Worker assignment with learning-forgetting effect in cellular manufacturing system using adaptive memetic differential search algorithm [J].
Chu, Xianghua ;
Gao, Da ;
Cheng, Shi ;
Wu, Lang ;
Chen, Jiansheng ;
Shi, Yuhui ;
Qin, Quande .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 :381-396
[9]   Production and shipment planning for Project Based Enterprises: Exploiting learning-forgetting phenomena for sustainable assembly of Curtain Walls [J].
Dal Borgo, Eleonora ;
Meneghetti, Antonella .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 :488-501
[10]   USING LEARNING-THEORY IN ASSEMBLY LINES FOR NEW PRODUCTS [J].
DAREL, EM ;
RUBINOVITZ, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1991, 25 (1-3) :103-109