Using Horn's Parallel Analysis Method in Exploratory Factor Analysis for Determining the Number of Factors

被引:131
作者
Cokluk, Omay [1 ]
Kocak, Duygu [2 ]
机构
[1] Ankara Univ, Fac Educ Sci, Dept Measurement & Evaluat, TR-06590 Ankara, Turkey
[2] Adiyaman Univ, Dept Measurement & Evaluat, Adiyaman, Turkey
来源
EDUCATIONAL SCIENCES-THEORY & PRACTICE | 2016年 / 16卷 / 02期
关键词
Construct validity; Parallel analysis; Exploratory factor analysis; Number of factors; The Monte Carlo Simulation Technique; DATA CORRELATION-MATRICES; ANALYSIS CRITERION; REGRESSION EQUATION; LATENT ROOTS; COMPONENTS; RELIABILITY;
D O I
10.12738/estp.2016.2.0328
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
In this study, the number of factors obtained from parallel analysis, a method used for determining the number of factors in exploratory factor analysis, was compared to that of the factors obtained from eigenvalue and scree plot-two traditional methods for determining the number of factors-in terms of consistency. Parallel analysis is based on random data generation, which is parallel to the actual data set, using the Monte Carlo Simulation Technique to determine the number of factors and the comparison of eigenvalues of those two data sets. In the study, the actual data employed for factor analysis was gathered from a total of 190 primary school teachers using the Organizational Trust Scale to explore a teacher's views about organizational trust in primary schools within the scope of another study. The Organizational Trust Scale comprises 22 items under the three factors of "Trust in Leaders," "Trust in Colleagues," and "Trust in Shareholders." A simulative data set with a sample size of 190 and 22 items was simulated in addition to the actual data through an SPSS syntax. The two data sets underwent parallel analysis with the iteration number of 1000. The number of factors was found to be three. This was consistent with the number of factors obtained in the development process of the scale. The number of factors was restricted to three and exploratory factor analysis was re-performed on the actual data. It was concluded that the item-factor distributions obtained as a result of the analyses were consistent with those obtained in the scale development study. Hence, parallel analysis was found to provide consistent results with the construct obtained in the scale development study.
引用
收藏
页码:537 / 551
页数:15
相关论文
共 63 条
[1]   REGRESSION EQUATIONS FOR THE LATENT ROOTS OF RANDOM DATA CORRELATION-MATRICES WITH UNITIES ON THE DIAGONAL [J].
ALLEN, SJ ;
HUBBARD, R .
MULTIVARIATE BEHAVIORAL RESEARCH, 1986, 21 (03) :393-398
[2]  
Anastasi A., 1968, PSYCHOL TESTING
[3]  
[Anonymous], 2001, METHODS PSYCHOL RES, V6, P141
[4]  
[Anonymous], 2007, Practical assessment, research evaluation, DOI [https://doi.org/10.7275/wjnc-nm63, DOI 10.7275/WJNC-NM63]
[5]  
Atilgan H., 2006, Egitimde Olcme ve Degerlendirme
[6]  
Baykul Y., 2000, EGITIMEDE VE PSIKOLO
[7]  
Bokeoglu O.C., 2008, EDUC SCI-THEOR PRACT, V54, P211
[8]   REMARKS ON PARALLEL ANALYSIS [J].
BUJA, A ;
EYUBOGLU, N .
MULTIVARIATE BEHAVIORAL RESEARCH, 1992, 27 (04) :509-540
[9]   THE EIGENVALUES-GREATER-THAN-ONE RULE AND THE RELIABILITY OF COMPONENTS [J].
CLIFF, N .
PSYCHOLOGICAL BULLETIN, 1988, 103 (02) :276-279
[10]  
Cokluk O., 2010, SOSYAL BILIMER ICIN