Real-Time Peak Valley Pricing Based Multi-Objective Optimal Scheduling of a Virtual Power Plant Considering Renewable Resources

被引:20
作者
Pandey, Anubhav Kumar [1 ]
Jadoun, Vinay Kumar [1 ]
Sabhahit, Jayalakshmi N. [1 ]
机构
[1] Manipal Acad Higher Educ, Manipal Inst Technol, Dept Elect & Elect Engn, Manipal 576104, India
关键词
virtual power plant; renewable energy resources; black widow optimization; multi-objective optimal scheduling; peak valley pricing; DEMAND RESPONSE; DISPATCH; MANAGEMENT; FRAMEWORK; STRATEGY; SYSTEM;
D O I
10.3390/en15165970
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In the era of aiming toward reaching a sustainable ecosystem, the primary focus is to curb the emissions generated by non-conventional resources. One way to achieve this goal is to find an alternative to traditional power plants (TPP) by integrating various distributed energy resources (DERs) via a Virtual Power Plant (VPP) in modern power systems. Apart from reducing emissions, a VPP enhances the monetary benefits to all its participants, including the DER owners, participants, and utility personnel. In this paper, the multi-objective optimal scheduling of the VPP problem considering multiple renewable energy resources has been solved using the multi-objective black widow optimization (MOBWO) algorithm. Renewable resources consist of solar PV modules, wind turbines, fuel cells, electric loads, heat-only units, and CHP units. The weighting factor method was adopted to handle the multi-objective optimal scheduling (MOOS) problem by simultaneously maximizing profit and minimizing emission while satisfying the related constraints. In this research, a peak valley power pricing strategy is introduced and the optimal scheduling of the VPP is attained by performing a multi-objective scheduling strategy (MOSS), which is day-ahead (on an hourly basis) and 15-min based (for a one-day profile), to observe the behavior of the anticipated system with a better constraint handling method. This algorithm is capable of dealing with a complex problem in a reduced computational time, ensuring the attainment of the considered objective functions. The numerical results obtained by the MOBWO algorithm after 100 independent trials were compared with the latest published work showing the effectiveness and suitability of the developed system.
引用
收藏
页数:30
相关论文
共 48 条
[41]  
You S, 2010, Ph.D. Thesis
[42]  
Yunlei Zhang, 2021, 2021 6th Asia Conference on Power and Electrical Engineering (ACPEE), P1010, DOI 10.1109/ACPEE51499.2021.9436861
[43]  
Zahedmanesh A, 2019, 2019 IEEE 1ST GLOBAL POWER, ENERGY AND COMMUNICATION CONFERENCE (GPECOM2019), P242, DOI 10.1109/GPECOM.2019.8778609
[44]   Stochastic multi-objective operational planning of smart distribution systems considering demand response programs [J].
Zakariazadeh, Alireza ;
Jadid, Shahram ;
Siano, Pierluigi .
ELECTRIC POWER SYSTEMS RESEARCH, 2014, 111 :156-168
[45]   Stochastic operational scheduling of distributed energy resources in a large scale virtual power plant [J].
Zamani, Ali Ghahgharaee ;
Zakariazadeh, Alireza ;
Jadid, Shahram ;
Kazemi, Ahad .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 82 :608-620
[46]   Day-ahead resource scheduling of a renewable energy based virtual power plant [J].
Zamani, Ali Ghahgharaee ;
Zakariazadeh, Alireza ;
Jadid, Shahram .
APPLIED ENERGY, 2016, 169 :324-340
[47]   An artificial bee colony approach for clustering [J].
Zhang, Changsheng ;
Ouyang, Dantong ;
Ning, Jiaxu .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (07) :4761-4767
[48]  
Zhang Tao, 2019, 2019 6 INT C INF SCI