Development of a Real-Time Monitoring and Calculation Method for TBM Disc-Cutter's Cutting Force in Complex Ground

被引:1
作者
Huang, Xing [1 ]
Wang, Shaohua [2 ]
Liu, Quansheng [3 ]
Wang, Xinyu [3 ]
Liu, Bin [1 ]
Zhang, Xiaobo [4 ]
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Shuiguohu St, Wuhan 430071, Hubei, Peoples R China
[2] Power Construct Corp China, Zhongnan Engn Corp Ltd, 16 Xiangzhang East Rd,Guitang,Yuhua Dist, Changsha 410014, Hunan, Peoples R China
[3] Wuhan Univ, Sch Civil Engn, Key Lab Geotech & Struct Engn Safety Hubei Prov, Shuiguohu St, Wuhan 430072, Hubei, Peoples R China
[4] Changjiang River Sci Res Inst, Wuhan 430010, Hubei, Peoples R China
来源
GEOTECHNICAL TESTING JOURNAL | 2022年 / 45卷 / 05期
基金
中国国家自然科学基金;
关键词
tunnel boring machine; cutting forces; real-time monitoring; cylindrical strain gauges multi-de- gree-of-freedom coupled vibration differential equation; Wilson-theta inverse analysis method; IN-SITU MEASUREMENTS; BORING-MACHINE; TUNNEL; SYSTEM; MODEL;
D O I
10.1520/GTJ20210149
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Cutting force is an essential parameter of the operating state of tunneling boring machines. In this study, a real-time cutting force monitoring method is proposed for widely used disc-cutters. A microcylindrical strain gauge is embedded in predrilled small boreholes in the bottom and side surface of the two C-shaped cushion blocks on the cutter saddle. The strain gauges are protected by a glue seal, and the sensor leads are protected using a groove and covered by wear-resistant steel. The strain is measured using a wireless strain node and transmitted from the strain node to the wireless gateway connected to a computer. Then, the strain-force relationship of the cushion block is fitted using a laboratory static calibration test. The load on the cushion block is calculated based on the measured cushion block strain. Subsequently, considering the cutter system's vibration, a multi-degree-of-freedom coupling vibration differential equation of the cutter system is established. The mass matrix, stiffness matrix, and damping matrix of the cutter system are also determined. Finally, a Wilson -0 inverse analysis method is put forward to calculate the cutter's external load. The developed real-time cutting force monitoring method will not affect cutter replacement, and the cushion block equipped with sensors can be reused. The cutting force identification method, which considers the cutter system vibration, is rigorous in theory, and a useful numerical inverse analysis calculation method is provided.
引用
收藏
页码:961 / 984
页数:24
相关论文
共 36 条
[1]  
[陈超 Chen Chao], 2015, [实验力学, Journal of Experimental Mechanics], V30, P373
[2]  
Chen Y. L., 1980, MINING EAR PROCESSIN, P15
[3]   Cutter force measurement on tunnel boring machines - Implementation at Koralm tunnel [J].
Entacher, M. ;
Winter, G. ;
Galler, R. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 38 :487-496
[4]   Cutter force measurement on tunnel boring machines - System design [J].
Entacher, M. ;
Winter, G. ;
Bumberger, T. ;
Decker, K. ;
Godor, I. ;
Galler, R. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 31 :97-106
[5]   Online monitoring and analysis of TBM cutter temperature: A case study in China [J].
Fu, Jie ;
Wu, Dun ;
Lan, Hao ;
Ji, Zhiyong ;
Li, Wenxin ;
Xia, Yimin .
MEASUREMENT, 2021, 174
[6]  
Gobetz F. W., 1973, INT J ROCK MECH MIN, V11, pA13
[7]   Development and Application of Cutterhead Working Status Monitoring System for Shield TBM Tunnelling [J].
Gong, Qiuming ;
Wu, Fan ;
Wang, Dujuan ;
Qiu, Haifeng ;
Yin, Lijun .
ROCK MECHANICS AND ROCK ENGINEERING, 2021, 54 (04) :1731-1753
[8]  
Han W., 2015, TUNNEL CONSTRUCTION, V35, P957
[9]  
He L. K., 2013, MACHINE TOOL HYDRAUL, V41, P49
[10]  
Hopkins M.J., 1979, P INT C MIN MACH MAC, P335