A simulation-optimization framework for Research and Development Pipeline management

被引:62
作者
Subramanian, D [1 ]
Pekny, JF [1 ]
Reklaitis, GV [1 ]
机构
[1] Purdue Univ, Sch Chem Engn, W Lafayette, IN 47907 USA
关键词
D O I
10.1002/aic.690471010
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The Research and Development Pipeline management problem has far-reaching economic implications for new-product-development-driven industries, such as pharmaceutical. biotechnology and agrochemical industries. Effective decision-making is required with respect to portfolio selection and project task scheduling in the face of significant uncertainty and an ever-constrained resource pool. The here-and-now stochastic optimization problem inherent to the management of an R&D Pipeline is described in its most general form, as well as a computing architecture, Sim-Opt, that combines mathematical programming and discrete event system simulation to assess the uncertainty and control the risk present in the pipeline. The R&D Pipeline management problem is viewed in Sim-Opt as the control problem of a performance-oriented, resource-constrained. stochastic, discrete-event, dynamic system. The concept of time lines is used to study multiple unique realizations of the controlled evolution of the discrete-event pipeline system. Four approaches using various degrees of rigor were investigated for the optimization module in Sim-Opt, and their relative performance is explored through an industrially motivated case study. Methods are presented to efficiently integrate information across the time lines from this framework. This integration of information demonstrated in a case study was used to infer a creative operational policy for the corresponding here-and-now stochastic optimization problem.
引用
收藏
页码:2226 / 2242
页数:17
相关论文
共 18 条
  • [1] [Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
  • [2] Risk management in the development of new products in highly regulated industries
    Blau, G
    Mehta, B
    Bose, S
    Pekny, J
    Sinclair, G
    Keunker, K
    Bunch, P
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (2-7) : 659 - 664
  • [3] BLAU GE, 1997, CAST COMMUNICATIONS
  • [4] Resource-constrained project scheduling: Notation, classification, models, and methods
    Brucker, P
    Drexl, A
    Mohring, R
    Neumann, K
    Pesch, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) : 3 - 41
  • [5] Cassandras Christos., 1993, Discrete Event Systems: Modeling and Performance Analysis
  • [6] CORMEN TH, 1990, INTRO ALGORITHMS, P263
  • [7] Operation of pipeless batch plants - I. MILP schedules
    Gonzalez, R
    Realff, MJ
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (7-8) : 841 - 855
  • [8] A framework for schedule evaluation with processing uncertainty
    Honkomp, SJ
    Mockus, L
    Reklaitis, GV
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 (4-5) : 595 - 609
  • [9] HONKOMP SJ, 1998, THESIS PURDUE U SCH
  • [10] Resource-constrained scheduling of tests in new product development
    Jain, V
    Grossmann, IE
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (08) : 3013 - 3026