Optimization for the Integrated Operations in an Uncertain Construction Supply Chain

被引:24
作者
Liu, Qiurui [1 ,2 ]
Xu, Jiuping [3 ,4 ]
Qin, Fei [5 ,6 ]
机构
[1] Huazhong Agr Univ, Coll Publ Adm, Wuhan 430070, Hubei, Peoples R China
[2] McGill Univ, Fac Management, Montreal, PQ H3A 1G5, Canada
[3] Sichuan Univ, Business Sch, Chengdu 610064, Sichuan, Peoples R China
[4] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Sichuan, Peoples R China
[5] Soochow Univ, Dongwu Business Sch, Suzhou 215021, Peoples R China
[6] Shippensburg Univ, John L Grove Coll Business, Shippensburg, PA 17257 USA
关键词
Construction supply chain (CSC); integrated operations; multistage decision making; optimization; purchasing-inventory-production; quantitative mathematical models; MULTIOBJECTIVE GENETIC ALGORITHM; PROGRAMMING APPROACH; MANAGEMENT; DESIGN; MODEL; INDUSTRY; COMPONENTS; FRAMEWORK; SELECTION; DEMANDS;
D O I
10.1109/TEM.2017.2686489
中图分类号
F [经济];
学科分类号
02 ;
摘要
Large construction and infrastructure projects are a billion-dollar business, but few studies have addressed the integrated operations in this unique domain of the construction supply chain (CSC). The comparison between the CSC and a conventional supply chain enables us to examine its framework and establish a quantitative optimization model for the CSC. To introduce the integrated operations concept into the CSC, many uncertainties need to be first dealt with, for which a multiobjective uncertain optimization model is developed. As the optimization of the owner and fabricator's costs and the service level are the main objectives, a hybrid genetic algorithm with fuzzy-random method is developed to solve the optimization model. An integrated multiobjective purchasing and production planning model is then constructed and applied to a hydropower construction project in Southwest China. The results illustrate that efficient integrated operations are critical for the CSC performance. The optimization results also indicate that considering of uncertain rush orders and delay times can be vital for optimum CSC performance. With this proposed method, construction managers can quickly respond to changing uncertain demand. This paper has highlighted that project managers need to collaborate with other stakeholders to ensure optimal CSC performance.
引用
收藏
页码:400 / 414
页数:15
相关论文
共 42 条
[1]  
Akintoye A., 2000, European Journal of Purchasing & Supply Management, V6, P159, DOI 10.1016/S0969-7012(00)00012-5
[2]   A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty [J].
Al-e-hashem, S. M. J. Mirzapour ;
Malekly, H. ;
Aryanezhad, M. B. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 134 (01) :28-42
[3]   A genetic algorithm approach for multi-objective optimization of supply chain networks [J].
Altiparmak, Fulya ;
Gen, Mitsuo ;
Lin, Lin ;
Paksoy, Turan .
COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 51 (01) :196-215
[4]   An integrated model for closed-loop supply chain configuration and supplier selection: Multi-objective approach [J].
Amin, Saman Hassanzadeh ;
Zhang, Guogqing .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (08) :6782-6791
[5]  
[Anonymous], 2000, Eur. J. Purchas. Suppl. Manag., DOI DOI 10.1016/S0969-7012(00)00013-7
[6]   A multi-objective stochastic programming approach for supply chain design considering risk [J].
Azaron, A. ;
Brown, K. N. ;
Tarim, S. A. ;
Modarres, M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 116 (01) :129-138
[7]  
Briscoe G., 2001, Eur. J. Purch. Supply Manag, V7, P243, DOI [10.1016/S0969-7012(01)00005-3, DOI 10.1016/S0969-7012(01)00005-3]
[8]   A Quantitative Framework for Managing Project Value, Risk, and Opportunity [J].
Browning, Tyson R. .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2014, 61 (04) :583-598
[9]   A deteriorating multi-item inventory model with price discount and variable demands via fuzzy logic under resource constraints [J].
Chakraborty, N. ;
Mondal, S. ;
Maiti, M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (04) :976-987
[10]   A mathematical programming approach to supply chain models with fuzzy parameters [J].
Chen, SP ;
Chang, PC .
ENGINEERING OPTIMIZATION, 2006, 38 (06) :647-669