A two-stage stochastic framework for effective management of multiple energy carriers

被引:39
作者
Mohamed, Mohamed A. [1 ]
Tajik, Elham [2 ]
Awwad, Emad Mahrous [3 ]
El-Sherbeeny, Ahmed M. [4 ]
Elmeligy, Mohammed A. [5 ]
Ali, Ziad M. [6 ,7 ]
机构
[1] Menia Univ, Fac Engn, Elect Engn Dept, Al Minya 61519, Egypt
[2] Univ Oklahoma, Sch Elect & Comp Engn, Norman, OK 73019 USA
[3] King Saud Univ, Coll Engn, Elect Engn Dept, Riyadh 11421, Saudi Arabia
[4] King Saud Univ, Coll Engn, Ind Engn Dept, Riyadh 11421, Saudi Arabia
[5] King Saud Univ, Adv Mfg Inst, Riyadh 11421, Saudi Arabia
[6] Prince Sattam Bin Abdulaziz Univ, Coll Engn Wadi Addawaser, Kharj 11991, Saudi Arabia
[7] Aswan Univ, Fac Engn, Elect Engn Dept, Tingar 81542, Egypt
关键词
Energy hub; Electrical-thermal; Water; Market clearing price; Uncertainty; Point estimate method; OPTIMAL BIDDING STRATEGY; WIND POWER; HUB OPERATION; OPTIMIZATION; NETWORK; MARKET;
D O I
10.1016/j.energy.2020.117170
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper suggests optimal scheduling of Energy Hub (EH) considering water to maximize its profit in a pool-based day-ahead electricity market where the EH including electrical-thermal-water demands. The proposed model is expressed as a bi-level problem and allows the EH acts as an independent price maker considering uncertain parameters. The market settlement mechanism is based on the pay-at-MCP where every market participant is paid at the Market Clearing Price (MCP). Maximizing the profit of the recommended strategic producer and minimizing dispatch cost within the power grid are represented as the upper level and lower level of the bi-level stochastic optimization problem, respectively. The problem is formulated with Mathematical Program with Equilibrium Constraints (MPEC) and is converted into a new Mixed-Integer Linear Program (MILP) based on Karush-Kuhn-Tucker (KKT) conditions. To model the high uncertainties associated with water, heat and electricity demand within the EH as well as the uncertainties in the generators and loads submitted a price to the market, a stochastic framework based on Point Estimate Method (PEM) is developed. Due to the complex and nonlinear nature of the proposed problem, a new optimization algorithm based on a modified Bat Algorithm (BA) is applied to solve the problem optimally. To confirm the strong performance of the proposed strategic EH producer in the electricity market as well as its effect on the buses' Locational Marginal Prices (LMPs) in a transmission-constrained market, authors applied the presented approach on the 24-bus IEEE system. So overall, the presence of line congestions may increase the opportunity of the proposed producers to make a profit. Depending on the lines' connection points, the effects of the congestion lines on profit varies in lines. The effective performance of the proposed model is demonstrated in the results. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:16
相关论文
共 33 条
[1]   Optimal Operation of Residential Energy Hubs in Smart Grids [J].
Bozchalui, Mohammad Chehreghani ;
AhsanHashmi, Syed ;
Hassen, Hussin ;
Canizares, Claudio A. ;
Bhattacharya, Kankar .
IEEE TRANSACTIONS ON SMART GRID, 2012, 3 (04) :1755-1766
[2]   Price-taker bidding strategy under price uncertainty [J].
Conejo, AJ ;
Nogales, FJ ;
Arroyo, JM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1081-1088
[3]   Optimal Bidding Strategy of a Strategic Wind Power Producer in the Short-Term Market [J].
Dai, Ting ;
Qiao, Wei .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (03) :707-719
[4]   Optimal bidding strategy for an energy hub in energy market [J].
Davatgaran, Vahid ;
Saniei, Mohsen ;
Mortazavi, Seyed Saeidollah .
ENERGY, 2018, 148 :482-493
[5]   Price maker self-scheduling in a pool-based electricity market: A mixed-integer LP approach [J].
de la Torre, S ;
Arroyo, JM ;
Conejo, AJ ;
Contreras, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1037-1042
[6]   Stochastic risk-constrained scheduling of smart energy hub in the presence of wind power and demand response [J].
Dolatabadi, Amirhossein ;
Mohammadi-Ivatloo, Behnam .
APPLIED THERMAL ENGINEERING, 2017, 123 :40-49
[7]  
Etamaly A.M., 2015, SMART ENERGY GRID EN, P1
[8]   Energy hubs for the future [J].
Geidl, Martin ;
Koeppel, Gaudenz ;
Favre-Perrod, Patrick ;
Kloeckl, Bernd ;
Andersson, Goran ;
Froehlich, Klaus .
IEEE POWER & ENERGY MAGAZINE, 2007, 5 (01) :24-30
[9]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018
[10]  
Islam Md Mainul, 2015, Przeglad Elektrotechniczny, V91, P122, DOI 10.15199/48.2015.08.29