Heuristic algorithms for lotsize scheduling with application in the tobacco industry

被引:16
作者
Pattloch, M
Schmidt, G
Kovalyov, MY
机构
[1] Univ Saarland, D-66041 Saarbrucken, Germany
[2] DFN Verein, D-10963 Berlin, Germany
[3] Natl Acad Sci Byelarus, Inst Engn Cybernet, Minsk 220012, BELARUS
关键词
lotsize scheduling; changeover costs; single machine; parallel machines; heuristics; experimental analysis;
D O I
10.1016/S0360-8352(01)00004-3
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We investigate a production planning problem which appears in many industries. We present an example from the tobacco industry. The basic question is how tasks of different types can be scheduled on machines in lots such that the number of changeovers is minimized. These changeovers occur if two tasks of different types are scheduled in sequence on a machine. We analyze the problem in detail and present heuristics for the single and multiple machine case. We evaluate these heuristics and give recommendations for their application to serial production systems. (C) 2001 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:235 / 253
页数:19
相关论文
共 14 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
BLAZEWICZ J, 1996, SCHEDULING COMPUTER
[3]   A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem [J].
Blocher, JD ;
Chand, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (03) :456-470
[4]  
BRUNO J, 1978, SIAM J COMPUT, V7, P393, DOI 10.1137/0207031
[5]  
Driscoll W. C., 1977, AIIE Transactions, V9, P388, DOI 10.1080/05695557708975171
[6]   A DYNAMIC-PROGRAMMING SOLUTION TO THE DYNAMIC, MULTI-ITEM, SINGLE-MACHINE SCHEDULING PROBLEM [J].
GASCON, A ;
LEACHMAN, RC .
OPERATIONS RESEARCH, 1988, 36 (01) :50-56
[7]   MINIMUM CHANGE-OVER SCHEDULING OF SEVERAL PRODUCTS ON 1 MACHINE [J].
GLASSEY, CR .
OPERATIONS RESEARCH, 1968, 16 (02) :342-&
[8]   SOME OPTIMUM ALGORITHMS FOR SCHEDULING PROBLEMS WITH CHANGEOVER COSTS [J].
HU, TC ;
KUO, YS ;
RUSKEY, F .
OPERATIONS RESEARCH, 1987, 35 (01) :94-99
[9]  
KOVALYOV MY, 2001, UNPUB IMPROVED ALGOR
[10]   A STRONG CUTTING PLANE ALGORITHM FOR PRODUCTION SCHEDULING WITH CHANGEOVER COSTS [J].
MAGNANTI, TL ;
VACHANI, R .
OPERATIONS RESEARCH, 1990, 38 (03) :456-473