An advanced scatter search algorithm for solving job shops with sequence dependent and non-anticipatory setups

被引:9
作者
Gonzalez, Miguel A. [1 ]
Vela, Camino R. [1 ]
Varela, Ramiro [1 ]
Gonzalez-Rodriguez, Ines [2 ]
机构
[1] Univ Oviedo, Ctr Artificial Intelligence, Dept Comp, Comp Technol Grp, Gijon 33271, Spain
[2] Univ Cantabria, Dept Math Stat & Comp, E-39005 Santander, Spain
关键词
Job shop scheduling; neighborhood structures; scatter search; path relinking; tabu search; non-anticipatory setup times; BOUND METHOD; TABU SEARCH; TIMES;
D O I
10.3233/AIC-140631
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper we tackle the makespan minimization in the job shop scheduling problem with sequence- dependent nonanticipatory setup times. To this end, we design a scatter search algorithm which incorporates path relinking and tabu search in its core. The good performance of this algorithm relies on a new neighborhood structure proposed in this paper based on a graph model that incorporates the non- anticipatory characteristic of setup times. To define this structure, we consider all single moves, i.e., reversals of single arcs in the solution graph, and we give some conditions that establish the feasibility and the chance of improvement for the neighbors. We present the results of an experimental study across usual benchmarks to analyze our algorithm and to compare it with the state-of-the-art. In particular, our approach establishes new best solutions for all the instances.
引用
收藏
页码:179 / 193
页数:15
相关论文
共 37 条
[1]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[2]  
[Anonymous], P 18 INT C AUT PLANN
[3]  
[Anonymous], THESIS U DUNDEE
[4]  
[Anonymous], ORSA J COMPUTING
[5]  
[Anonymous], 1969, MANAGE SCI
[6]  
[Anonymous], 2008, Scheduling: Theory, Algorithms, and Systems
[7]   Minimizing total tardiness in parallel machine scheduling with setup times:: An adaptive memory-based GRASP approach [J].
Armentano, Vinicius Amaral ;
de Franca Filho, Moacir Felizardo .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (01) :100-114
[8]   A branch and bound method for the job-shop problem with sequence-dependent setup times [J].
Artigues, Christian ;
Feillet, Dominique .
ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) :135-159
[9]   Job shop scheduling with setup times, deadlines and precedence constraints [J].
Balas, Egon ;
Simonetti, Neil ;
Vazacopoulos, Alkis .
JOURNAL OF SCHEDULING, 2008, 11 (04) :253-262
[10]  
Brucker P, 1996, OR SPEKTRUM, V18, P145, DOI 10.1007/BF01539706