Investigating the effects of building information modeling capabilities on knowledge management areas in the construction industry

被引:5
作者
Rezahoseini, Ali [1 ]
Noori, Siamak [1 ]
Ghannadpour, Seyed Farid [1 ]
Bodaghi, Mostafa [2 ]
机构
[1] Iran Univ Sci & Technol, Sch Ind Engn, Tehran, Iran
[2] Univ Tehran, Sch Architecture, Coll Art & Architecture, Tehran, Iran
关键词
Project Management Knowledge (PMBOK); Building Information Modeling (BIM); Project Integrated Management; Construction Industry; BIM;
D O I
10.5267/j.jpm.2018.8.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to manage a project seamlessly, there is a need to establish effective communication between different departments and identify the risks in the project, determine the affected or influencing stakeholders, provide timely resources and logistics, and manage the available resources to make a framework for project implementation. In order to successfully complete the project it is also necessary to focus on approved costs, project completion time and quality within the specified range. Project management is the coordination among different parts of the project to achieve the main goals of the project and the stakeholders' expectations. To achieve this, there are several standards and one of the most recognized standards is the Project Management Knowledge Facility (PMBOK), which has come with the assistance of Project Managers for professional, targeted and comprehensive management. PMBOK is not just a guideline and a methodology for project management. Building Information Modeling (BIM), a project management methodology has been adopted in recent years to design a project integrated as a 3-D information model, which adds all project information in the various phases of the project to a 3-D information model. The purpose of this research is to gather some date from experts using some questionnaires in the area of project management to build an information modeling. The study determines that each of the basic BIM capabilities had positive effects on different domains of PMBOK knowledge. Moreover, using SAW analysis, the study suggests that BIM had the greatest impact on project integration management, and finally, the BIM general process model is introduced to implement each of the areas of knowledge. (C) 2019 by the authors; licensee Growing Science, Canada.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 24 条
[1]   Web-enabled project management: an emerging paradigm in construction [J].
Alshawi, M ;
Ingirige, B .
AUTOMATION IN CONSTRUCTION, 2003, 12 (04) :349-364
[2]  
[Anonymous], 2009, BUSINESS VALUE BIM G
[3]  
[Anonymous], 2012, THESIS U MARYLAND MA
[4]  
Azhar S., 2011, Leadership and Management in Engineering, V11, P241, DOI DOI 10.1061/(ASCE)LM.1943-5630.0000127
[5]  
Bodaghee S., 2014, 2 INT MAN ACC C
[6]  
Broquetas M., 2010, THESIS
[7]   The project benefits of Building Information Modelling (BIM) [J].
Bryde, David ;
Broquetas, Marti ;
Volm, Juergen Marc .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) :971-980
[8]  
Dang D.T. P., 2012, Impact of 4d Modeling on Construction Planning Process
[9]  
Eastman C. M., 2011, BIM Handbook A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, DOI [DOI 10.5130/AJCEB.V12I3.2749, 10.1002/9780470261309.ch8, DOI 10.1002/9780470261309.CH8]
[10]   Integrated visualized time control system for repetitive construction projects [J].
Elbeltagi, Emad ;
Dawood, Mahmoud .
AUTOMATION IN CONSTRUCTION, 2011, 20 (07) :940-953