Staffing needs and utilization for alternative contracting methods in highway design and construction

被引:4
|
作者
Tran, Dai Q. [1 ]
Harper, Christofer M. [2 ]
Smadi, Adi M. [1 ]
Mohamed, Mamdouh [1 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[2] Colorado State Univ, Construct Management, Ft Collins, CO 80523 USA
关键词
Project delivery methods; Alternative contracts; Staffing; Highways; The United States; PROJECT DELIVERY; PROCUREMENT; SELECTION;
D O I
10.1108/ECAM-07-2019-0342
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This research investigates procedures and effective practices on staffing needs and utilization for successful implementation of alternative contracting methods (ACMs) in the United Sates, including design-build (D-B) and construction manager/general contractor (CM/GC) delivery methods. Design/methodology/approach The review of published empirical studies, a national survey of transportation agencies and case studies of highway agencies form the basis of the conclusions in this research. In addition to the national survey, with 46 of 50 agencies participating, the research presents case studies from five highway agencies in the United States including the following: California, Florida, Georgia, Minnesota and Virginia. These five case studies were selected from agencies that have extensive experience in delivering ACM projects. The case studies involved a thorough procedural review and structured interviews of agency personnel. The agencies then validated the results and conclusions. Findings The results showed that implementing ACM projects requires different knowledge, skills and management and coordination efforts than traditional design-bid-build (D-B-B) projects. The study found that the key success factors of implementing ACMs are the following: (1) establishment of an ACM champion; (2) active involvement of key staff throughout the ACM project development process; (3) appropriate use of consultants and (4) ACM training and staff development. Originality/value This research is the first attempt to examine the staffing needs and utilization for ACM projects.
引用
收藏
页码:2163 / 2178
页数:16
相关论文
共 50 条
  • [41] Framework for Objectively Determining Best Practices for Alternative Contracting Methods
    Gransberg, Douglas D.
    Scheepbouwer, Eric
    del Puerto, Carla Lopez
    TRANSPORTATION RESEARCH RECORD, 2017, (2630) : 51 - 58
  • [42] EVALUATION METHODS OF ALTERNATIVE SOLUTIONS FOR HIGHWAY TRAFFIC CONTROL
    DINOTO, D
    ZOPPOLI, R
    ELETTROTECNICA, 1974, 61 (05): : 464 - 464
  • [43] Current Practices of Highway Construction Cost Index Calculation and Utilization
    Shrestha, K. Joseph
    Jeong, H. David
    Gransberg, Douglas D.
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 351 - 360
  • [44] Challenges with Pile Design and Construction on the Coquihalla Highway
    Childs, Stuart
    Williams, James
    Bala, Gurpreet
    GEO-CONGRESS 2024: FOUNDATIONS, RETAINING STRUCTURES, GEOSYNTHETICS, AND UNDERGROUND ENGINEERING, 2024, 350 : 236 - 245
  • [45] Lighting design for highway nighttime construction operations
    El-Rayes, K
    Hyari, K
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 93 - 98
  • [46] Key Performance Indicators in Highway Design and Construction
    Molenaar, Keith R.
    Navarro, Desiderio
    TRANSPORTATION RESEARCH RECORD, 2011, (2228) : 51 - 58
  • [47] Design on Management Platform of Rural Highway Construction
    Rong Liu
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1220 - 1223
  • [48] SUSTAINABLE DESIGN AND CONSTRUCTION ELEMENTS IN GREEN HIGHWAY
    Rooshdi, Raja Rafidah Raja Muhd
    Abd Majid, Muhd Zaimi
    Sahamir, Shaza Rina
    JURNAL TEKNOLOGI, 2015, 77 (16): : 113 - 118
  • [49] GEOLOGICAL PROBLEMS IN HIGHWAY DESIGN AND CONSTRUCTION IN KANSAS
    HORNER, SE
    DOBROVOLNY, E
    GEOLOGICAL SOCIETY OF AMERICA BULLETIN, 1951, 62 (12) : 1451 - 1451
  • [50] MARGINAL ANALYSIS IN PRACTICE - AN ALTERNATIVE TO NEEDS ASSESSMENT FOR CONTRACTING HEALTH-CARE
    COHEN, D
    BRITISH MEDICAL JOURNAL, 1994, 309 (6957): : 781 - 784